1 General Provisions
1.1 Purpose
With a view to strengthening safety supervision of boilers, preventing and minimizing accidents, guaranteeing life and property safety of the masses and promoting the economic development, this regulation is formulated according to the relevant requirements of "Special Equipment Safety Law of the People's Republic of China" and "Regulation on Safety Supervision of Special Equipment".
1.2 Application scope
This regulation is applicable to the following boilers as defined in "Special Equipment Directory", i.e. the stationary pressure-bearing steam boiler (Note 1-1), pressure-bearing hot-water boiler, organic heat transfer material boiler as well as flue boiler and flue-shell composite waste heat boiler, both of which take the waste heat utilization as the fundamental purpose.
Note 1-1: the stationary boiler means that the boiler is fixed during the service period.
1.2.1 Boiler body
The integral that is composed of boiler drum, heating surface and the header & connecting pipeline, furnace, combustion equipment and air preheater (including flue and air duct), structure (including platform and staircase), furnace wall and slag removal equipment.
1.2.2 Boiler external piping
(1) Power station boiler, including main feed water pipeline, main steam pipe and reheat steam pipe;
(2) Boilers beyond power station boilers are divided into the boiler with steam (waster/oil) manifold (Note 1-2) and without it; the former includes the pressure pipe [including steam (waster/oil) manifold) in the first pass of circumferential weld connected between the boiler feed water (oil) pump & steam (waster/oil) manifold outlet and the external pipe while the latter includes the pressure pipe in the boiler feed water (oil) pump outlet and boiler main steam (water and oil) outlet valve.
Note 1-2: the steam (waster/oil) manifold shall meet the relevant requirements of the header in this regulation.
1.2.3 Boiler safety accessories and instruments
Boiler safety accessories and instruments includes safety valve, pressure measuring device, water level meter and indicator, temperature measuring device, blowdown and drainage device as well as safety protection devices and relevant instruments.
1.2.4 Boiler accessory and system
Boiler accessory and system includes the fuel preparation, steam-water and water treatment equipment and systems.
1.3 Inapplicable scope
This regulation is not applicable to the following equipment:
(1) Steam boiler with the normal design water volume less than 30L;
(2) Steam boiler with the rated steam pressure less than 0.1MPa;
(3) Hot-water boiler with the rated water-delivery pressure or rated thermal power less than 0.1MPa or 0.1MW respectively;
(4) Organic heat transfer material boiler with the rated thermal power less than 0.1MW;
(5) Heat exchanger required for equipment and process flow cooling.
1.4 Boiler equipment grade
1.4.1 Grade A boiler
Grade A boiler refers to that with p (gauge pressure, the same below, Note 1-3) greater than or equal to 3.8MPa, including:
(1) Supercritical boiler, p≥22.1MPa;
(2) Supercritical boiler, 16.7MPa≤p<22.1MPa;
(3) Superhigh pressure boiler, 13.7MPa≤p<16.7MPa;
(4) High pressure boiler, 9.8MPa≤p<13.7MPa;
(5) Sub-high-pressure boiler, 5.3MPa≤p<9.8MPa;
(6) Medium pressure boiler, 3.8MPa≤p<5.3MPa.
1.4.2 Grade B boiler
(1) Steam boiler, 0.8MPa
0.7MW (Q is the rated thermal power, the same below); liquid-phase organic heat transfer material boiler, Q>4.2MW.
1.4.3 Grade C boiler
(1) Steam boiler, p≤0.8MPa and V>50L (V is the normal design water volume, the same below);
(2) Hot-water boiler, p<3.8MPa and t<120℃;
(3) Gas-phase organic heat transfer material boiler, 0.1MW≤Q≤0.7MW; liquid-phase organic heat transfer material boiler, 0.1MW≤Q≤4.2MW.
1.4.4 Grade D boiler
(1) Steam boiler, p≤0.8MPa and 30L≤V≤50L;
(2) Hot-water boiler with only tap water pressurization and t≤95℃.
Note 1-3: p is the rated working pressure of the boiler; for the steam boiler, it represents the rated steam pressure; for the hot-water boiler, it represents the rated water-delivery pressure; for the organic heat transfer material boiler, the represents the rated outlet pressure.
1.5 Imported boilers
Foreign boilers that are used in China shall meet requirements of this regulation; in case of any inconsistency with those specified in this regulation, technical evaluation and approval shall be carried out according to the requirements of Article 1.6 of this regulation.
1.6 If new material, process, and technology (including introducing foreign technology, manufacturing according to foreign standards and adopting new structure, etc.) adopted by organizations concerned are inconsistent with this regulation, or no relevant requirements are proposed in this regulation and safety performance may be influenced greatly, declaration may be submitted to the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China (hereinafter referred to as AQSIQ) which entrusts security techniques advisory organization or professional organization to make technical evaluation. After the evaluation result is approved by AQSIQ, new material, process, and technology can be used for production.
1.7 Supervision and administration
(1) Boiler design, manufacturing, installation (including commissioning), application, inspection, improvement and repair shall be implemented according to the requirements of this regulation;
(2) Boiler and the system energy efficiency shall meet requirements of laws and regulations, technical codes and corresponding standards with regard to energy conservation;
(3) Boiler manufacturing, installation (including commissioning), application, improvement, repair and inspection organization shall timely fill in and report the information according to informatization requirements;
(4) The GAQSIQ and the local quality and technical supervision departments (hereinafter referred to as "quality supervision department") are in charge of the supervision of the boiler safety and this regulation.
1.8 Relationship between technical standard and management system
This regulation specifies the basic safety requirements of boilers as well as the relevant technical standards and management systems, which shall not be lower than those specified in this regulation.
1.9 Description for relationship between chapters
Special requirements for the hot-water boiler, organic heat transfer material boiler, cast-iron boiler and Grade D boiler are implemented respectively according to Chapters 10-13 of this regulation and adopted preferentially.
2 Materials
2.1 Basic requirements
Metal material, bearing member material and the welding material of boiler pressure parts shall meet requirements of corresponding national and professional standards; the metal material and the welding material of the pressure parts under service conditions shall be provided with adequate strength, plasticity, toughness as well as good antifatigue performance and corrosion resistance.
2.2 Performance requirements
(1) Killed steel shall be adopted for the boiler pressure parts and the bearing member welded with pressure parts;
(2) Charpy impact absorbed energy (KV2) under ambient temperature of steels for boiler pressure parts is greater than or equal to 27J;
(3) Percentage elongation after fracture (A) under ambient temperature of steel plates for boiler pressure parts shall be greater than or equal to 18%.
2.3 Material selection
Steel plates, steel tube, forgings, steel castings, iron castings, fasteners, tension braces and welding materials for the boiler pressure parts shall be selected according to those specified in this article.
2.3.1 Material of steel plate for the boiler
The material of steel plate for the boiler is detailed in Table 2-1.
Table 2-1 Material of Steel Plate for the Boiler
Steel type Designation serial numbers of standards Application scope
Working pressure (MPa) Wall temperature (℃)
Carbon steel Q235B
Q235C
Q235D GB/T 3274 ≤1.6 ≤300
15,20 GB/T 711 ≤350
Q245R GB 713 ≤5.3 (Note 2-2) ≤430
Alloy steel Q345R GB 713 ≤430
15CrMoR GB 713 Unlimited ≤520
12Cr1MoVR GB 713 Unlimited ≤565
13MnNiMoR GB 713 Unlimited ≤400
Note 2-1: names of the standards for the materials listed in Table 2-1 are as follows: "Hot-Rolled Plates and Strips of Carbon Structural Steels and High Strength Low Alloy Structural Steels" (GB/T 3274), "Hot-Rolled Quality Carbon Structural Steel Plates Sheets and Wide Strips" (GB/T 711) and "Steel Plates For Boiler and Pressure Vessels" (GB 713).
Note 2-2: where the drum (shell) free from radiant heat is manufactured, the working pressure will be unlimited.
Note 2-3: where other materials listed in GB 713 are used for the boiler steel plate, the application scope may be selected according to the relevant requirements of "Pressure Vessels" (GB 150).
2.3.2 Material of steel tube for the boiler
The material of steel tube for the boiler is detailed in Table 2-2.
Table 2-2 Material of Steel Tube for the Boiler
Steel type Designation Serial numbers of standards Applicable scope
Usage Working pressure (MPa) Wall temperature (℃)
(Note 2-5)
Carbon steel Q235B GB/T 3091 Hot water pipeline ≤1.6 ≤100
L210 GB/T 9711 Hot water pipeline ≤2.5 —
10,20 GB/T 8163 Heating surface pipe ≤1.6 ≤350
Header and piping ≤350
YB 4102 Heating surface pipe ≤5.3 ≤300
Header and piping ≤300
GB 3087 Heating surface pipe ≤5.3 ≤460
Header and piping ≤430
Carbon steel 20G GB 5310 Heating surface pipe Unlimited ≤460
Header and piping ≤430
20MnG,25MnG GB 5310 Heating surface pipe Unlimited ≤460
Header and piping ≤430
Alloy steel 15Ni1MnMoNbCu GB 5310 Header and piping Unlimited ≤450
15MoG,20MoG GB 5310 Heating surface pipe Unlimited ≤480
12CrMoG,15CrMoG GB 5310 Heating surface pipe Unlimited ≤560
15Ni1MnMoNbCu GB 5310 Header and piping Unlimited ≤450
15MoG,20MoG GB 5310 Heating surface pipe Unlimited ≤480
12CrMoG,15CrMoG GB 5310 Heating surface pipe Unlimited ≤560
Header and piping Unlimited ≤550
12Cr1MoVG GB 5310 Heating surface pipe Unlimited ≤580
Header and piping Unlimited ≤565
12Cr2MoG GB 5310 Heating surface pipe Unlimited ≤ 600*
Header and piping Unlimited ≤575
12Cr2MoWVTiB GB 5310 Heating surface pipe Unlimited ≤600*
12Cr3MoVSiTiB Heating surface pipe Unlimited ≤600*
07Cr2MoW2VNbB GB 5310 Heating surface pipe Unlimited ≤600*
10Cr9Mo1VNbN GB 5310 Heating surface pipe Unlimited ≤650*
Header and piping Unlimited ≤620
10Cr9MoW2VNbBN GB 5310 Heating surface pipe Unlimited ≤650*
Header and piping Unlimited ≤630
07Cr19Ni10 GB 5310 Heating surface pipe Unlimited ≤670*
10Cr18Ni9NbCu3BN GB 5310 Heating surface pipe Unlimited ≤705*
07Cr25Ni21NbN GB 5310 Heating surface pipe Unlimited ≤730*
07Cr19Ni11Ti GB 5310 Heating surface pipe Unlimited ≤670*
07Cr18Ni11Nb GB 5310 Heating surface pipe Unlimited ≤670*
08Cr18Ni11NbFG GB 5310 Heating surface pipe Unlimited ≤700*
Note 2-4: names of standards for materials listed in Table 2-2 are as follows: "Welded Steel Pipes for Low Pressure Liquid Delivery" (GB/T 3091), "Petroleum and Natural Gas Industries - Steel Pipe for Pipeline Transportation Systems" (GB/T 9711), "Seamless Steel Tubes for Liquid Service" (GB/T 8163), "Welded Steel Tubes for Low and Medium Pressure Boiler" (YB 4102), "Seamless Steel Tubes for Low and Medium Pressure" (GB 3087) and "Seamless Steel Tubes and Pipes for High Pressure Boiler" (GB 5310).
Note 2-5: (1) The wall temperature marked with “*” refers to the external wall temperature of the pipe on the side of flue gas while other wall temperatures refers to the calculated wall temperatures of boilers;
(2) During the design and material selection for the supercritical boiler or above, full consideration shall be given to the oxidation corrosion by the steam in the inner wall.
(3) Materials like sulfuric acid dew point corrosion-resistant steel (09CrCuSb) with service conditions and technical requirements conforming to "Water-tube Boilers" (GB/T 16507) and "Shell Boilers" (GB/T 16508) can be used for the heated surface at the end of boiler.
2.3.3 Material of forgings for the boiler
The material of forgings for the boiler is detailed in Table 2-3.
Table 2-3 Material of Forgings for the Boiler
Steel type Designation Serial numbers of standards Applicable scope
Working pressure (MPa) Wall temperature (℃)
Carbon steel 20,25 JB/T 9626 ≤5.3 (Note 2-7) ≤430
Alloy steel 12CrMo Unlimited ≤550
15CrMo ≤550
12Cr1MoV ≤565
Note 2-6: name of the standard for the material listed in Table 2-3 is as: "Specification for Boiler Forging" (JB/T 9626).
Note 2-7: the working pressure of the forgings in no contact with the flame is unlimited.
Note 2-8: for boiler forgings with the working pressure and wall temperature less than or equal to 2.5MPa and 350℃ respectively, Q235 may be adopted for the fabrication.
Note 2-9: where materials in "Carbon and Low-alloy Steel Forgings for Pressure Vessels" (NB/T 47008/JB/T 4726) not listed in Table 2-3 are used for the boiler forgings, the selection of the applicable scope may be implemented by reference to the relevant requirements of GB 150.
2.3.4 Material of steel castings for the boiler
The material of steel castings for the boiler is detailed in Table 2-4.
Table 2-4 Material of Steel Castings for the Boiler
Steel type Designation Serial numbers of standards Applicable scope
Working pressure (MPa) Wall temperature (℃)
Carbon steel ZG200-400 JB/T 9625 ≤5.3 ≤430
ZG230-450 Unlimited ≤430
Alloy steel ZG20CrMo ≤510
ZG20CrMoV ≤540
ZG15Cr1Mo1V ≤570
Note 2-10: Note 2-4: name of the standard for the material listed in Table 2-4 is as: "Specification for Pressure Retaining Casting of Boiler Pipe Fittings" (JB/T 9625).
2.3.5 Material of iron castings for the boiler
The material of iron castings for the boiler is detailed in Table 2-5.
Table 2-5 Material of Iron Castings for the Boiler
Type Designation Serial numbers of standards Applicable scope
Nominal diameter of accessories, DN (mm) Working pressure (MPa) Wall temperature (℃)
Grey cast iron Not less than HT150 GB/T 9439 ≤300 ≤0.8 <230
JB/T 2639 ≤200 ≤1.6
Malleable cast iron KTH300-06 GB/T 9440 ≤100 ≤1.6 <300
KTH330-08
KTH350-10
KTH370-12
Spheroidal graphite cast iron QT400-18,QT450-10 GB/T 1348 ≤150 ≤1.6 <300
JB/T 2637 ≤100 ≤2.5
Note 2-11: names of standards for materials listed in Table 2-5 are as follows: "Grey Iron Castings" (GB/T 9439), "Technical Specifications for Pressure-bearing Grey Iron Casting of Boiler" (JB/T 2639), "Malleable iron castings" (GB/T 9440), "Spheroidal Graphite Iron Castings" (GB/T 1348) and "Technical Specifications for Pressure-bearing Spheroidal Graphite Iron Casting of Boiler" (JB/T 2637)
2.3.6 Material of fasteners
The material of fasteners for the boiler is detailed in Table 2-6.
Table 2-6 Material of Fasteners
Steel type Designation Serial numbers of standards Applicable scope
Working pressure (MPa) Service temperature (℃)
Carbon steel 20,25 GB/T 699 Unlimited ≤350
35 ≤420
Alloy steel 30CrMo GB/T 3077 ≤500
35CrMo DL/T 439 ≤500
25Cr2MoVA ≤510
25Cr2Mo1VA ≤550
20Cr1Mo1VNbTiB ≤570
20Cr1Mo1VTiB ≤570
20Cr13,30Cr13 GB/T 1220 ≤450
12Cr18Ni9 ≤610
Note 2-12: names of standards for materials listed in Table 2-6 are as follows: "Quality Carbon Structural Steels" (GB/T 699), "Alloy Structure Steels" (GB/T 3077), "The Technical Guide for High-temperature Bolt of Fossil-Fired Power Plant" (DL/T 439) and "Stainless Steel Bars" (GB/T 1220).
Note 2-13: where materials such as carbon steel and alloy steel studs and nuts listed in GB 150, that are not listed in Table 2-6 are used for the boiler fasteners, the selection of the applicable scope may be implemented by reference to the relevant requirements of GB 150.
Note 2-14: for fasteners for the boiler components with the working pressure less than or equal to 1.6MPa and wall temperature greater than or equal to 350℃, Q235 may be adopted for the fabrication.
2.3.7 Material of boiler tension braces
Steel plate for boilers shall be selected for the material of the boiler tension braces and they shall be selected according to requirements of "Hot-rolled Round Carbon Steel Bars for Standard Parts" (GB 715) and "Quality Carbon Structural Steels" (GB/T 699).
2.3.8 Welding material
Selection of welding material shall meet the requirements of "Technical Permission of Steel Welding Rod Purchasing for Pressure Vessels" (NB/T 47018.1~47018.7 /JB/T 4747).
2.3.9 Special requirements for material selection and processing
(1) Corresponding materials of steel tube for the boiler may be adopted for hot working and processing of pipe fittings (such as three-way, elbow and reducer union) and elements such as header head;
(2) Except various types of flanges, the outside diameter of the carbon steel hollow circular pipe fittings is less than or equal to 160mm; that of alloy steel hollow circular pipe fittings or pipe fittings with caps is less than or equal to 114mm. If the processed pipe fittings not only meet the requirements of the non-destructive testing, but also their longitudinal axes are parallel to the axes of the round steel, rolling or forged round steel may be adopted for the processing;
(3) Grey cast iron shall not be used to fabricate the blowdown valve and blowdown elbow;
(4) For boilers with the rated working pressure less than or equal To 1.6MPa and superheaters with the steam temperature less than or equal To 300℃, the malleable iron or the spheroidal graphite cast iron listed in Table 2-5 may be adopted for the fabrication of their blow-off valve and blowdown valve;
(5) For the square cast-iron economizer and elbow of the boiler with the rated working pressure less than or equal To 2.5MPa, grey cast iron with the designation not greater than or equal to HT 200 are allowed to be adopted; for the square cast-iron economizer and elbow of the boiler with the rated working pressure less than or equal to 1.6MPa, the grey cast iron with the designation greater than or equal to HT 150 are allowed to be adopted;
(6) Repair welding is forbidden for the iron castings for the pressure parts.
2.4 Material substitution
Substitute material of the boiler shall meet the material requirements in this regulation. The material substitution shall meet requirements of strength, structure and process and shall be agreed by the technical division (including design and process department) of the material substitution organization.
2.5 Development of new material
Where new material not listed in this regulation is adopted, the development organization of the material shall carry out experimental investigation for the test before the preproduction and the material shall pass the technical review and approval according to the requirements of Article 1.6 in this regulation. The review shall cover chemical compositions, physical properties, mechanical property, structure stability, high-temperature property, corrosion resistance and process property.
Foreword I
1 General Provisions
2 Materials
3 Design
4 Manufacturing
5 Installation, Improvement and Repair
6 Safety Accessories and Instruments
7 Combustion Equipment, Auxiliary Equipment and System
8 Application and Management
9 Inspection
10 Hot-water Boiler and System
11 Organic Heat Transfer Material Boiler and System
12 Cast-iron Boiler
13 Grade D Boiler
14 Supplementary Provisions
Annex A Conformity Certificate of Boilers
Attached Table A Boiler Data
Annex B Numbering Method of Special Equipment Code
Development (Revision) of Relevant Regulations and Specifications
《锅炉安全技术监察规程》(TSG G0001-2012)
第1号修改单
一、将1.1修改为:目的
“为了加强锅炉安全监察,防止和减少事故,保障人民群众生命和财产安全,促进经济发展,根据《中华人民共和国特种设备安全法》和《特种设备安全监察条例》的有关规定,制定本规程。”
二、将1.2修改为:适用范围
“本规程适用于《特种设备目录》所定义的固定式(注1-1)承压蒸汽锅炉、承压热水锅炉、有机热载体锅炉,以及以余(废)热利用为主要目的的烟道式、烟道与管壳组合式余(废)热锅炉。”
三、将1.3修改为:不适用范围
“本规程不适用于以下设备:
“(1)设计正常水位水容积小于30L的蒸汽锅炉;
“(2)额定蒸汽压力小于0.1MPa的蒸汽锅炉;
“(3)额定出水压力小于0.1MPa或者额定热功率小于0.1MW的热水锅炉;
“(4)额定热功率小于0.1MW的有机热载体锅炉;
“(5)为满足设备和工艺流程冷却需要的换热装置。”
四、将1.4.3修改为: C级锅炉
“(1)蒸汽锅炉,p≤0.8MPa,且V>50L(V为设计正常水位水容积,下同);
“(2)热水锅炉,p<3.8MPa,且t<120℃;
“(3)气相有机热载体锅炉,0.1MW≤Q≤0.7MW;液相有机热载体锅炉,0.1MW≤Q≤4.2MW。”
五、将1.4.4修改为: D级锅炉
“(1)蒸汽锅炉,p≤0.8MPa,且30L≤V≤50L;
“(2)仅用自来水加压的热水锅炉,且t≤95℃。”
删除注1-4。
六、将1.5修改为:进口锅炉
“境外制造在境内使用的锅炉应当符合本规程的要求,如果与本规程要求不一致时,应当按照本规程1.6的要求进行技术评审和批准。”
七、将1.6条修改为:“有关单位采用新材料、新工艺、新技术(包括引进境外技术、按照境外标准制造、新结构等),与本规程不符时,或者本规程未作要求,可能对安全性能有重大影响的,应当向国家质量监督检验检疫总局(以下简称国家质检总局)申报,由国家质检总局委托安全技术咨询机构或者专业机构进行技术评审,评审结果经国家质检总局批准,方可投入生产、使用。”
八、将 2.3.1表2-1注2-3修改为:“GB 713中所列的其他材料用作锅炉钢板时,其适用范围的选用可以参照GB 150《压力容器》的相关规定。”
将2.3.2表2-2注2-5 增加一项:“(3)使用条件和技术要求符合GB/T 16507《水管锅炉》和GB/T 16508《锅壳锅炉》的耐硫酸露点腐蚀钢(09CrCuSb)等材料可以用于锅炉尾部受热面。”
九、将3.3.2第一款修改为:“锅炉本体受压元件的强度可以按照GB/T 16507.4《水管锅炉 第4部分:受压元件强度计算》或者GB/T 16508.3《锅壳锅炉 第3部分:设计与强度计算》进行计算和校核。当采用试验方法、可对比的经验设计方法或者其他设计方法确定锅炉受压元件强度时,应当按照本规程1.6的规定执行。”
十、将3.7.2第一款“对于额定工作压力不大于2.5MPa的卧式内燃锅炉以及贯流式锅炉,工作环境烟温小于或者等于600℃的受压元件连接,在满足以下条件下可以采用T形接头的对接连接但不得采用搭接连接:”修改为:“对于额定工作压力不大于2.5MPa的卧式内燃锅炉、贯流式锅炉和锅壳式余热锅炉,工作环境烟温大于600℃并且受烟气直接冲刷的部位,不可以采用T形接头,其他部位在满足以下条件下,受压元件的连接可以采用T形接头的对接连接,但不得采用搭接连接:”
十一、将4.5.4.6 表4-1最后一行,即检测部位为锅筒、集箱上管接头的角接接头的A级一列下的检测方法及比例中的内容修改为:“外径大于108mm的全焊透结构的角接接头,100%超声检测;其他管接头的角接接头按照不少于接头数的20%进行表面检测……”
将4.5.4.6(2)修改为:“B级及以上热水锅炉无损检测比例及方法应当符合表4-1中相应级别蒸汽锅炉要求;C级热水锅炉集箱、管子、管道和其他管件的环向对接接头以及角接接头可不进行无损检测,其他主要受压元件的主焊缝应当进行10%的射线或者超声检测;”
十二、将4.5.6.2.2注4-4修改为:“敞口集箱、无成排受热面管接头以及内孔焊封底的成排管接头的集箱、启动(汽水)分离器、管道、储水箱、减温器、分配集箱等部件,其所有焊缝经过100%无损检测合格,以及对接焊接的受热面管及其他受压管件经过氩弧焊打底并且100%无损检测合格,能够确保焊接质量,在制造单位内可以不单独进行水压试验。零部件的水压试验压力应当不低于其所对应的锅炉本体水压试验压力。”
十三、将6.1.4(2)修改为:“额定工作压力为0.1MPa的蒸汽锅炉可以采用静重式安全阀或者水封式安全装置,热水锅炉上装设有水封式安全装置时,可以不装设安全阀;水封式安全装置的水封管内径应当根据锅炉的额定蒸发量(额定热功率)和额定工作压力确定,并且不小于25mm,不应当装设阀门,有防冻措施。”
十四、将6.6.1(1)修改为:“蒸汽锅炉应当装设高、低水位报警(高、低水位报警信号应当能够区分)和低水位联锁保护装置,保护装置最迟应当在最低安全水位时动作;”
十五、增加:8.1.15 锅炉定期自行检查
“使用单位每月对所使用的锅炉至少进行1次月度检查,并且应当记录检查情况。月度检查内容主要为锅炉承压部件及其安全附件和仪表、联锁保护装置是否完好,锅炉使用安全与节能管理制度是否有效执行,作业人员证书是否在有效期内,是否按规定进行定期检验,是否对水(介)质定期进行化验分析等,是否根据水汽品质变化进行排污调整,水封管是否堵塞,以及其他异常情况等。”
十六、将11.4.5.1(1)修改为:“液相传热系统以及液相强制循环节流减压蒸发气相系统至少应当安装两台电动循环泵及冷凝液供给泵,在其中一台停止运行时,其余循环泵或者供给泵的总流量应当能够满足该系统最大负荷运行的要求;对于热功率不大于0.3MW的电加热液相有机热载体锅炉,如果其传热系统配备有效的温度联锁保护装置,可以只安装一台电动循环泵;”
十七、将12.1修改为:允许使用范围
“额定出水温度低于120℃并且额定工作压力不超过0.7MPa的热水锅炉。”
十八、将12.3.2.3修改为:爆破试验压力
“热水锅炉额定出水压力小于或者等于0.4MPa时,爆破压力应当大于4p+0.2MPa;当额定出水压力大于0.4MPa时,爆破压力应当大于5.25p。”
十九、将12.3.3第二款修改为:“整体验证性水压试验压力为2p,并且不小于0.6MPa。”
二十、将12.4.4 表12-1修改为:
表12-1 试验压力与保压时间
名 称 水压试验压力(MPa) 在试验压力下保压时间(min)
受压铸件 2p,且不小于0.4 2
锅炉整体 1.5p,且不小于0.4 20
二十一、将13.1(1)(2)修改为:
“(1)热水锅炉受压元(部)件可以采用铝、铜合金以及不锈钢材料,管子可以采用焊接管,材料选用应当符合相关标准的规定;其他锅炉用材料应当满足本规程第2章的规定;
“(2)热水锅炉的锅筒(锅壳)、炉胆与相连接的封头、管板可以采用插入式全焊透的T形连接结构;”
将13.1(5)修改为“锅炉禁止改造。”
删除13.1(6)。
二十二、将13.2(2)修改为:“热水锅炉和额定工作压力为0.1MPa的蒸汽锅炉,在锅炉制造单位保证焊缝质量的前提下,可以不进行无损检测;”
将13.2(3)修改为:“锅炉制造单位应当在锅炉显著位置标注安全警示;”
二十三、删除13.3.2、13.3.3。
二十四、将13.3.4修改为:“13.3.2 排污管与排污阀连接
“锅炉排污管与排污阀可以采用螺纹连接。”
二十五、将13.4(1)(2)修改为:
“(1)锅炉可以不设独立的锅炉房,蒸汽锅炉安装位置应当与非操作人员有效隔离;
“(2)锅炉不需要安装告知,并且不实施安装监督检验;”
二十六、将13.5修改为:定期检验
“锅炉使用单位应当定期对锅炉的安全状况进行自行检查。”
二十七、将13.6(1)修改为“锅炉不需要办理使用登记”;
将13.6(4)修改为“锅炉操作人员不需取得《特种设备作业人员证》,但应当根据本规程13.4(3)的规定经过培训”。