![]() |
中标分类
行业分类
ICS分类
最新标准
|
登录注册 |
您的位置: 标准明细 |
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. According to the requirements of Document JIANBIAO [2013] No. 169 issued by the Ministry of Housing and Urban-Rural Development (MOHURD) - “Notice on Printing and Distributing ‘the Development and Revision Plan of professional engineering construction standards in 2014'”, this code is revised by the drafting group based on extensive investigation, careful summarization of practical experience, reference to relevant international and foreign advanced standards and widely solicitation for opinions. Main technical contents of this code cover general provisions (Chapter 1), terms and symbols (Chapter 2), basic requirements (Chapter 3), deformation observation methods (Chapter 4), layout and surveying of benchmarks (Chapter 5), deformation observation for field, ground and surroundings (Chapter 6), deformation observation for foundation and upper structure (Chapter 7), results compilation and analysis (Chapter 8) and quality inspection and acceptance (Chapter 9). The following main technical contents have been revised with respect to this code: requirements on technical design and implementation are strengthened; new technical methods for deformation measurement are added and such methods used less at present are added, and benchmark stability analysis in the former Chapter 8 is incorporated into Chapter 5; the former Chapters 5, 6 and 7 are comprehensively modified and are adjusted into the present Chapters 6 and 7 according to deformation measurement objects and types, convergence deformation observation and structural health monitoring are added, layout requirements, determination methods and result requirements of monitoring points in various deformation measurements; the former Chapters 8 and 9 are expanded and the requirements on quality inspection and acceptance of results are emphasized; contents in annexes are greatly adjusted. In this code, the provisions printed in bold type are compulsory and must be implemented strictly. The Ministry of Housing and Urban-Rural Development is in charge of the administration of this standard and the explanation of the compulsory provisions, and CIGIS (China) Limited is responsible for the explanation of specific technical contents. Any comment or suggestion arising from the implementation of this standard is kindly requested to be sent to CIGIS (China) Limited (address: No. 177 Dongzhimen Neidajie, Dongcheng District, 100007, Beijing). Code for Deformation Measurement of Building and Structure 1 General Provisions 1.0.1 This code is formulated with view to implementing China's relevant technical and economic policies in the deformation measurement of building and structure and achieving safety applicability, advanced technology, economic rationality and guaranteed quality. 1.0.2 This specification is applicable to technical design implementation, results compilation and quality inspection and acceptance for deformation measurement of various buildings and structures during construction period and service period. 1.0.3 Deformation measurement of building and structure shall not only meet those specified in this code, but also comply with the requirements of relevant national current standards. 2 Terms and Symbols 2.1 Terms 2.1.1 deformation a phenomenon of changes in shape or position of the building and structure generated under the action of load. It may be classified into two categories of settlement and displacement. The former indicates vertical deformation, including sinking and elevating, while the latter is a general term for deformations (except settlement), including horizontal displacement, inclination, deflection, crack, convergence deformation, wind loading deformation and sunshining deformation etc. 2.1.2 deformation measurement of building and structure observation on the changes in the shape or position of the field, ground, foundation, upper structure and surroundings of the building or structure generated under the action of load, as well as processing, expression and analysis on observation results 2.1.3 differential settlement the non-uniform settlement generated at different positions during the same period 2.1.4 inclination inclination includes foundation inclination and upper structure inclination. The former refers to the differential settlement caused by non-uniform settlement on both ends of the foundation, while the latter refers to the deviation of center line of the building and structure or certain point on its wall and column from the corresponding point at the bottom 2.1.5 deflection the deformation of foundation, member or upper structure of the building and structure caused by deflection under the action of the bending moment 2.1.6 convergence deformation the deformation of the buildings and structures like tunnel and culvert due to changes in surrounding rock stress during construction or operation 2.1.7 wind loading deformation the deformation of the building and structure generated under the action of strong wind. 2.1.8 sunshining deformation the deformation of the building and structure generated due to non-uniform heating by sunshining 2.1.9 deformation value the value of deformation, also referred to as deformation amount 2.1.10 allowable deformation value deformation control value determined in order to guarantee normal use of the building and structure 2.1.11 prewarning deformation value warning value calculated in certain proportion of allowable deformation value or given directly according to deformation sensitivity of the building and structure within the range of allowable deformation value 2.1.12 benchmark, reference point stable and long-time measuring point arranged for the purpose of deformation measurement, which may be classified into settlement benchmark and displacement benchmark according to types of the deformation measurement 2.1.13 working reference point relatively stable measuring point arranged for the convenience of field deformation observation, which may be classified into settlement working reference point and displacement working reference point according to types of the deformation measurement 2.1.14 monitoring point the measuring point, arranged at sensitive places of the field, ground, foundation, upper structure or surroundings of the building and structure, that can reflect their deformation characteristics, which may be classified into settlement monitoring point and displacement monitoring point 2.1.15 rate of deformation the deformation amount per unit time. 2.1.16 observation frequency observation times in certain time 2.1.17 observation cycle the time interval between two adjacent observations 2.1.18 deformation factor such factors causing deformation in the building and structure as load and time etc. 2.1.19 time series a series of numbers arranged by a series of observation data with equal time interval in order of observation time 2.1.20 structural health monitoring such work to acquire the characteristic information about the structure such as geometry, stress and strain in real time by means of automatic monitoring system, and further analyze and identify health conditions of the structure 2.2 Symbols 2.2.1 Deformation A——the amplitude of wind force; d——the displacement component; the deviation value; fc——the relative curvature of foundation; f1——the deflection value in horizontal direction; f1——the deflection value in vertical direction; s——the settlement; α——the inclination; the included angle; Δ——the deformation amount during two periods; Δd——the displacement component difference; Δs——the settlement difference. 2.2.2 Observation D——the distance; side length; h——the height difference; L——the length of annexed line, loop or collimation line; n——the observation set number; the station number; the height difference number; S——the sight length; αv——the vertical angle; v——the height of prism. 2.2.3 Root mean square error (RMSE) md——the root mean square error in determination of displacement component or deviation value; mΔd——the root mean square error in determination of displacement component difference; mh——the root mean square error of station height difference; m0——the root mean square error in single-range observation of each station height difference in leveling; ms——the root mean square error in determination of settlement; mΔs——the root mean square error in determination of settlement difference; mα——the root mean square error in determination of direction; mβ——the root mean square error of angle observation; μ——the root mean square error of unit weight. 2.2.4 Instrument parameters i——the included angle between collimation axis of level gauge and level tube axis; k——the linear expansion coefficient for temperature of convergence meter; 2C——two times the collimation error of theodolite. 2.2.5 Other symbols K——the vertical refraction coefficient of atmosphere; R——the average curvature radius of earth. 3 Basic Requirements 3.1 General Requirements 3.1.1 Deformation measurement shall be carried out for the following buildings and structures during construction period and service period: 1 Building and structure with Class A ground and foundation design. 2 Building and structure with Class B ground and foundation design on the soft ground. 3 Storey-adding and extended building and structure, or ones on treated ground. 4 Building and structure influenced by the adjacent construction or change in environmental factors such as field groundwater. 5 Building and structure with new foundation or structure adopted. 6 Large urban infrastructure. 7 Building and structure with long and narrow shape and obvious change in ground soil. 3.1.2 Deformation measurement of building and structure during construction period shall meet the following requirements: 1 For various buildings and structures, settlement observation shall be carried out, and settlement observation for ground, settlement observation for foundation soil layers and slope displacement observation should be carried out. 2 For foundation pit engineering, deformation observation for foundation pit and supported structure and deformation observation for surroundings shall be carried out; for Class I foundation pit, rebound observation for foundation pit shall be carried out. 3 For high-rise and super high-rise building and structure, inclination observation shall be carried out. 4 In case of any crack in building and structure, crack observation shall be carried out. 5 If required by construction of building and structure, other types of deformation observations shall be carried out. 3.1.3 Deformation measurement of building and structure during service period shall meet the following requirements: 1 For various buildings and structures, settlement observation shall be carried out. 2 For high-rise/super high-rise building and structure and towering structure, horizontal displacement observation and inclination observation shall be carried out. 3 For super high-rise building and structure, deflection observation, sunshining deformation observation and wind loading deformation observation shall be carried out. 4 For large-span building and structure such as municipal bridge, exhibition hall and stadium, deflection observation and wind loading deformation observation shall be carried out. 5 For tunnel and culvert etc., convergence deformation observation shall be carried out. 6 In case of any crack in building and structure, crack observation shall be carried out. 7 Where there operation of building and structure affects the surroundings, deformation observation for surroundings shall be carried out. 8 For super high-rise / large-span / irregular building and structure as well as large municipal infrastructures such as underground public facilities, culvert, bridge and tunnel, structural health monitoring should be carried out. 9 If required by operation and management of building and structure, other types of deformation observations shall be carried out. 3.1.4 Independent plane-coordinate system and height datum may be adopted for the deformation measurement of building and structure. For large project or ones with special requirements, China Geodetic Coordinate System 2000 and National Height Datum 1985 or plane-coordinate system and height datum used at the city of the project should be adopted. 3.1.5 Common era and Beijing time should be adopted as the unified time reference for the deformation measurement of building and structure. 3.1.6 Under one of the following conditions during the deformation measurement of building and structure, safety plan shall be immediately implemented and observation frequency shall be increased or observation contents shall be added simultaneously: 1 In case of abnormal change in deformation amount or rate. 2 Where the deformation amount or rate of deformation gets up to or exceeds the prewarning deformation value. 3 In case of collapse and landslide on excavation surface. 4 In case of abnormality in building and structure themselves or their surroundings. 5 In case of other abnormal deformation conditions caused by natural disasters such as earthquake, rainstorm and freezing/thawing. 3.1.7 Safety precautions shall be taken during deformation measurement of building and structure on the field. 3.2 Accuracy Class 3.2.1 Deformation measurement of building and structure shall take the root mean square error as the accuracy index and two times of the root mean square error as the limit error. 3.2.2 For the general deformation measurement items of building and structure, proper observation accuracy class may be selected from Table 3.2.2 according to the building and structure type, deformation measurement type, project survey, design, construction and use requirements or the requirements of the client. 1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 3.1 General Requirements 3.2 Accuracy Class 3.3 Technical Design and Implementation 4 Deformation Observation Methods 4.1 General Requirements 4.2 Leveling Survey 4.3 Hydrostatic Leveling 4.4 Trigonometric leveling 4.5 Surveying with Total Station 4.6 Surveying with GNSS 4.7 Laser-based Surveying 4.8 Close Range Photogrammetry 5 Layout and Surveying of Benchmarks 5.1 General Requirements 5.2 Layout and Surveying of Settlement Benchmarks 5.3 Layout and Surveying of Displacement Benchmarks 5.4 Stability Analysis of Benchmarks 6 Deformation Observation for Field, Ground and Surroundings 6.1 Settlement Observation for Ground 6.2 Settlement Observation for Foundation Soil Layers 6.3 Slope Displacement Monitoring 6.4 Deformation Observation for Foundation Pit and Supported Structure 6.5 Deformation Observation for Surroundings 7 Deformation Observation of Foundation and Upper Structure 7.1 Settlement Observation 7.2 Horizontal Displacement Observation 7.3 Inclination Observation 7.4 Crack Observation 7.5 Deflection Observation 7.6 Convergence Deformation Observation 7.7 Sunshining Deformation Observation 7.8 Wind Loading Deformation Observation 7.9 Structural Health Monitoring 8 Results Compilation and Analysis 8.1 General Requirements 8.2 Data Compilation 8.3 Monitoring Points Analysis 8.4 Modeling and Prediction 9 Quality Inspection and Acceptance 9.1 General Requirements 9.2 Quality Inspection 9.3 Quality Acceptance Annex A Deformation Observation Results Annex B Quality Inspection Log Explanation of Wording in This Code List of Quoted Standards 1 总 则 1.0.1 为了在建筑变形测量中贯彻执行国家有关技术经济政策,做到安全适用、技术先进、经济合理、确保质量,制定本规范。 1.0.2本规范适用于各种建筑在施工期间和使用期间变形测量的技术设计、作业实施、成果整理及质量检验等。 1.0.3建筑变形测量除应符合本规范的规定外,尚应符合国家现行有关标准的规定。 2术语和符号 2.1 术 语 2.1.1变形deformation 建筑在荷载作用下产生的形状或位置变化的现象。可分为沉降和位移两大类。沉降指竖向的变形,包括下沉和上升;而位移为除沉降外其他变形的统称,包括水平位移、倾斜、挠度、裂缝、收敛变形、风振变形和日照变形等。 2.1.2 建筑变形测量deformation measurement of building and structure 对建筑物或构筑物的场地、地基、基础、上部结构及周边环境受荷载作用而产生的形状或位置变化进行观测,并对观测结果进行处理、表达和分析的工作。 2.1.3差异沉降differential settlement 不同位置在同一时间段产生的不均匀沉降现象。 2.1.4倾斜inclination 包括基础倾斜和上部结构倾斜。基础倾斜指的是基础两端由于不均匀沉降而产生的差异沉降现象;上部结构倾斜指的是建筑的中心线或其墙、柱上某点相对于底部对应点产生的偏离现象。 2.1.5挠度deflection 建筑的基础、构件或上部结构等在弯矩作用下因挠曲而产生的变形。 2.1.6收敛变形convergence deformation 隧道、涵洞等类型的建筑在施工或运营过程中因围岩应力变化产生的变形。 2.1.7风振变形wind loading deformation 建筑受强风作用而产生的变形。 2.1.8 日照变形sunshining deformation 建筑受阳光照射受热不均而产生的变形。 2.1.9变形值deformation value 变形大小的数值,也称变形量。 2.1.10变形允许值allowable deformation value 为保证建筑正常使用而确定的变形控制值。 2.1.11变形预警值prewarning deformation value 在变形允许值范围内,根据建筑变形的敏感程度,以变形允许值的一定比例计算的或直接给定的警示值。 2.1.12基准点benchmark,reference point 为进行变形测量而布设的稳定的、长期保存的测量点。根据变形测量的类型,可分为沉降基准点和位移基准点。 2.1.13工作基点working reference point 为便于现场变形观测作业而布设的相对稳定的测量点。根据变形测量的类型,可分为沉降工作基点和位移工作基点。 2.1.14监测点 monitoring point 布设在建筑场地、地基、基础、上部结构或周边环境的敏感位置上能反映其变形特征的测量点。根据变形测量的类型,可分为沉降监测点和位移监测点。 2.1.15变形速率rate of deformation 单位时间的变形量。 2.1.16观测频率observation frequency 一定时间内的观测次数。 2.1.17观测周期observation cycle 相邻两次观测之间的时间间隔。 2.1.18变形因子deformation factor 引起建筑变形的因素,如荷载、时间等。 2.1.19时间序列time series 等时间间隔的一系列观测数据按观测时间先后排序而成的数列。 2.1.20结构健康监测structural health monitoring 利用自动化监测系统实时获取结构的几何及应力、应变等特征信息,进而分析和识别结构健康状况的工作。 2.2 符 号 2.2.1 变形量 A——风力振幅; d——位移分量;偏离值; fc——基础相对弯曲度; f1——水平方向的挠度值; f1——垂直方向的挠度值; s——沉降量; α——倾斜度;夹角; Δ——两期间的变形量; Δd——位移分量差; Δs——沉降差。 2.2.2观测量 D——距离;边长; h——高差; L——附合路线、环线或视准线长度; n——测回数;测站数;高差个数; S——视线长度; αv——垂直角; v——棱镜高。 2.2.3 中误差 md——位移分量或偏离值测定中误差; mΔd——位移分量差测定中误差; mh——测站高差中误差; m0——水准测量单程观测每测站高差中误差; ms——沉降量测定中误差; mΔs——沉降差测定中误差; mα——方向观测中误差; mβ——测角中误差; μ——单位权中误差。 2.2.4仪器参数 i——水准仪视准轴与水准管轴的夹角; k——收敛尺的温度线膨胀系数; 2C——经纬仪两倍视准误差。 2.2.5其他符号 K——大气垂直折光系数; R——地球平均曲率半径。 3 基本规定 3.1 总体要求 3.1.1 下列建筑在施工期间和使用期间应进行变形测量: 1 地基基础设计等级为甲级的建筑。 2软弱地基上的地基基础设计等级为乙级的建筑。 3加层、扩建建筑或处理地基上的建筑。 4受邻近施工影响或受场地地下水等环境因素变化影响的建筑。 5采用新型基础或新型结构的建筑。 6大型城市基础设施。 7体型狭长且地基土变化明显的建筑。 3.1.2建筑在施工期间的变形测量应符合下列规定: 1对各类建筑,应进行沉降观测,宜进行场地沉降观测、地基土分层沉降观测和斜坡位移观测。 2对基坑工程,应进行基坑及其支护结构变形观测和周边环境变形观测;对一级基坑,应进行基坑回弹观测。 3对高层和超高层建筑,应进行倾斜观测。 4当建筑出现裂缝时,应进行裂缝观测。 5建筑施工需要时,应进行其他类型的变形观测。 3.1.3建筑在使用期间的变形测量应符合下列规定: 1对各类建筑,应进行沉降观测。 2对高层、超高层建筑及高耸构筑物,应进行水平位移观测、倾斜观测。 3对超高层建筑,应进行挠度观测、日照变形观测、风振变形观测。 4对市政桥梁、博览(展览)馆及体育场馆等大跨度建筑,应进行挠度观测、风振变形观测。 5对隧道、涵洞等,应进行收敛变形观测。 6当建筑出现裂缝时,应进行裂缝观测。 7 当建筑运营对周边环境产生影响时,应进行周边环境变形观测。 8对超高层建筑、大跨度建筑、异型建筑以及地下公共设施、涵洞、桥隧等大型市政基础设施,宜进行结构健康监测。 9建筑运营管理需要时,应进行其他类型的变形观测。 3.1.4建筑变形测量可采用独立的平面坐标系统及高程基准。对大型或有特殊要求的项目,宜采用2000国家大地坐标系及1985国家高程基准或项目所在城市使用的平面坐标系统及高程基准。 3.1.5建筑变形测量应采用公历纪元、北京时间作为统一时间基准。 3.1.6建筑变形测量过程中发生下列情况之一时,应立即实施安全预案,同时应提高观测频率或增加观测内容: 1变形量或变形速率出现异常变化。 2变形量或变形速率达到或超出变形预警值。 3开挖面或周边出现塌陷、滑坡。 4建筑本身或其周边环境出现异常。 5 由于地震、暴雨、冻融等自然灾害引起的其他变形异常情况。 3.1.7在现场从事建筑变形测量作业,应采取安全防护措施。 3.2精度等级 3.2.1建筑变形测量应以中误差作为衡量精度的指标,并以二倍中误差作为极限误差。 3.2.2对通常的建筑变形测量项目,可根据建筑类型、变形测量类型以及项目勘察、设计、施工、使用或委托方的要求,从表3.2.2中选择适宜的观测精度等级。 表3.2.2建筑变形测量的等级、精度指标及其适用范围 等级 沉降监测点测站高差中误差 (mm) 位移监测点坐标中误差 (mm) 主要适用范围 特等 0.05 0.3 特高精度要求的变形测量 一等 0.15 1.0 地基基础设计为甲级的建筑的变形测量;重要的古建筑、历史建筑的变形测量;重要的城市基础设施的变形测量等 二等 0.5 3.0 地基基础设计为甲、乙级的建筑的变形测量;重要场地的边坡监测;重要的基坑监测;重要管线的变形测量;池下工程施工及运营中的变形测量;重要的城市基础设施的变形测量等 三等 1.5 10.0 地基基础设计为乙、丙级的建筑的变形测量;一般场地的边坡监测;一般的基坑监测;地表、道路及一般管线的变形测量;一般的城市基础设施的变形测量;日照变形测量;风振变形测量等 四等 3.0 20.0 精度要求低的变形测量 注:1沉降监测点测站高差中误差:对水准测量,为其测站高差中误差;对静力水准测量、三角高程测量,为相邻沉降监测点间等价的高差中误差; 2位移监测点坐标中误差:指的是监测点相对于基准点或工作基点的坐标中误差、监测点相对于基准线的偏差中误差、建筑上某点相对于其底部对应点的水平位移分量中误差等。坐标中误差为其点位中误差的 倍。 3.2.3对明确要求按建筑地基变形允许值来确定精度等级或需要对变形过程进行研究分析的建筑变形测量项目,应符合下列规定: 1应根据变形测量的类型和现行国家标准《建筑地基基础设计规范》GB 50007规定或工程设计给定的建筑地基变形允许值,先按下列方法估算变形测量精度: 1)对沉降观测,应取差异沉降的沉降差允许值的 作为沉降差测定的中误差,并将该数值视为监测点测站高差中误差; 2)对位移观测,应取变形允许值的 作为位移量 测定中误差,并根据位移量测定的具体方法计算监测点坐标中误差或测站高差中误差。 2 估算出变形测量精度后,应按下列规则选择本规范表 3.2.2规定的精度等级: 1)当仅给定单一变形允许值时,应按所估算的精度选择满足要求的精度等级;当给定多个同类型变形允许值时,应分别估算精度,按其中最高精度选择满足要求的精度等级; 2)当估算的精度低于本规范表3.2.2中四等精度的要求时,应采用四等精度; 3)对需要研究分析变形过程的变形测量项目,宜在上述确定的精度等级基础上提高一个等级。 3.3技术设计与实施 3.3.1建筑变形测量的技术设计与实施,应能反映建筑场地、地基、基础、上部结构及周边环境在荷载和环境等因素影响下的变形程度或变形趋势,并应满足建筑设计、施工和管理对变形信息的使用要求。 3.3.2对建筑变形测量项目,应根据项目委托方要求、建筑类型、岩土工程勘察报告、地基基础和建筑结构设计资料、施工计划以及测区条件等编写技术设计。技术设计应包括下列主要内容: 1任务要求。 2待测建筑概况,包括建筑及其结构类型、岩土工程条件、建筑规模、所在位置、所处工程阶段等。, 3 已有变形测量成果资料及其分析。 4依据的技术标准名称及编号。 5变形测量的类型和精度等级。 6采用的平面坐标系统、高程基准。 7基准点、工作基点和监测点布设方案,包括标石与标志型式、埋设方式、点位分布及数量等。 8观测频率及观测周期。 9变形预警值及预警方式。 10仪器设备及其检校要求。 11观测作业及数据处理方法要求。 12提交成果的内容、形式和时间要求。 13成果质量检验方式。 14相关附图、附表等。 3.3.3建筑变形测量基准点和工作基点的布设及观测应符合本规范第5章的规定。变形监测点的布设应根据建筑结构、形状和场地工程地质条件等确定,点位应便于观测、易于保护,标志应稳固。 3.3.4建筑变形测量的仪器设备应符合下列规定: 1水准仪及配套水准尺、全站仪、卫星导航定位测量系统等仪器设备,应经法定计量检定机构检定合格,并应在检定有效期内使用。 2作业前和作业过程中,应根据现场作业条件的变化情况,对所用仪器设备进行检查校正。 3作业时,仪器设备应避免安置在有空压机、搅拌机、卷扬机、起重机等振动影响的范围内。 4仪器设备应在其说明书给出的作业条件下使用,有关安装、操作及设备维护等应符合其说明书的规定。 3.3.5建筑变形测量应根据确定的观测频率和观测周期进行观测。变形观测频率和观测周期应根据建筑的工程安全等级、变形类型、变形特征、变形量、变形速率、施工进度计划以及外界因素影响等情况确定。 3.3.6对建筑变形测量项目的基准点、工作基点和监测点,首期(即零期)应连续进行两次独立测量。当相应两次观测数据的较差不大于极限误差时,应取其算术平均值作为该项园变形测量的初始值,否则应立即进行重测。 3.3。7各期变形测量应在短时间内完成。对不同期测量,宜采用相同的观测网形、观测路线和观测方法,并宜使用相同的测量仪器设备。对于特等和一等变形观测,尚宜固定观测人员、选择最佳观测时段并在相近的环境条件下观测。 3.3.8各期变形测量作业过程中,应进行观测数据的记录存储;同时应进行现场巡视,并应记录建筑状态、施工进度、气象和周边环境状况以及作业中出现的有关情况。 3.3.9 当某期变形测量作业中,出现监测点被破坏或不能被观测时,应在备注中说明,并应及时通报项目委托方。 3.3.10 当按任务要求或项目技术设计,变形测量作业将要终止时,若变形尚未达到稳定状态,应及时与项目委托方沟通,并应在项目技术报告中明确说明。 3.3.11各期变形测量应进行数据整理和成果质量检查。最终项目综合成果应进行质量验收。 4变形观测方法 4.1一般规定 4.1.1对建筑变形测量项目,应根据所需测定的变形类型、精度要求和现场作业条件来选择相应的观测方法。一个项目中可组合使用多种观测方法。对有特殊要求的变形测量项目,可同时选择多种观测方法相互校验。 4.1.2当采用光学水准仪、光学经纬仪、电子经纬仪、光电测距仪等进行建筑变形观测时,技术要求可按本规范关于数字水准仪和全站仪测量的相关规定及国家现行有关标准的规定执行。 4.1.3当变形测量需采用特等精度时,应对所用测量方法、仪器设备及具体作业过程等进行专门的技术设计、精度分析,并宜进行试验验证。 4.2水准测量 4.2.1 当采用水准测量进行沉降观测时,所用仪器型号和标尺类型应符合表4.2.1的规定。 表4.2.1水准仪型号和标尺类型 等级 水准仪型号 标尺类型 一等 DS05 因瓦条码标尺 二等 DS05 因瓦条码标尺、玻璃钢条码标尺 DS1 因瓦条码标尺 三等 DS05、DS1 因瓦条码标尺、玻璃钢条码标尺 DS3 玻璃钢条码标尺 四等 DS1 因瓦条码标尺、玻璃钢条码标尺 DS3 玻璃钢条码标尺 4.2.2水准测量的作业方式应符合表4.2.2的规定。 表4.2.2沉降观测作业方式 沉降 观测等级 基准点测量、工作基点联 测及首期沉降观测 其他各期沉降观测 DS05型 仪器 DS1型 仪器 DS3型 仪器 DS05型 仪器 DS1型 仪器 DS3型 仪器 观测顺序 一等 往返测 — — 往返测 或单程双测站 — — 奇数站:后—前—前—后 偶数站:前—后—后—前 二等 往返测 往返测 或单程双测站 — 单程 观测 单程 双测站 — 奇数站:后—前—前—后 偶数站:前—后—后—前 三等 单程 双测站 单程 双测站 往返测或单程双测站 单程 观测 单程 观测 单程 双测站 后—前—前—后 四等 — 单程 双测站 往返测或单程双测站 — 单程 观测 单程 双测站 后—后—前—前 4.2.3水准测量应符合下列规定: 1观测视线长度、前后视距差、视线高度及重复测量次数应符合表4.2.3-1的规定。 表4.2.3-1数字水准仪观测要求 沉降观测等级 视线长度 (m) 前后视距差 (m) 前后视距差累积 (m) 视线高度 (m) 重复测量次数 (次) 一等 ≥4且≤30 ≤1.0 ≤3.0 ≥0.65 ≥3 二等 ≥3且≤50 ≤1.5 ≤5.0 ≥0.55 ≥2 三等 ≥3且≤75 ≤2.0 ≤6.0 ≥0.45 ≥2 四等 ≥3且≤100 ≤3.0 ≤10.0 ≥0.35 ≥2 注:1在室内作业时,视线高度不受本表的限制。 2 当采用学水准仪时,观测要求应满足表中各项要求。 2 观测限差应符合表4.2.3-2的规定。 表4.2.3-2数字水准仪观测限差(mm) 沉降观测 等级 两次读数所测高 差之差限差 往返较差及附合或环线闭合差限差 单程双测站所测 高差较差限差 检测已测测段高差之差限差 一等 0.5 0.3 0.2 0.45 二等 0.7 1.0 0.7 1.5 三等 3.0 3.0 2.0 4.5 四等 5.0 6.0 4.0 8.5 注:1 表中n为测站数。 2当采用光学水准仪时,基、辅分划或黑、红面读数较差应满足表中两次读数所测高差之差限差。 4.2.4每期观测开始前,应测定数字水准仪的i角。当其值对一等、二等沉降观测超过15″,对三等、四等沉降观测超过20″时,应停止使用,立即送检。当观测成果出现异常,经分析可能与仪器有关时,应及时对仪器进行检验。 4.2.5水准测量作业应符合下列规定: 1应在标尺分划线成像清晰和稳定的条件下进行观测,不得在日出后或日落前约半小时、太阳中天前后、风力大于四级、气温突变时以及标尺分划线的成像跳动而难以照准时进行观测,阴天可全天观测。 2观测前半小时,应将数字水准仪置于露天阴影下,使仪器与外界气温趋于一致。观测前,应进行不少于20次单次测量的预热。晴天观测时,应使用测伞遮蔽阳光。 3应避免望远镜直接对着太阳,并应避免观测视线被遮挡。仪器应在其生产厂家规定的温度范围内工作。当遇临时振动影响时,应暂停作业。当长时间受振动影响时,应增加重复测量次数。 4各期观测过程中,当发现相邻监测点高差变动异常或附近地面、建筑基础和墙体出现裂缝时,应进行记录。 4.2.6观测成果的重测和取舍应符合下列规定: 1凡超出本规范表4.2.3-2规定限差的成果,均应在分析原因的基础上进行重测。当测站观测限差超限时,对在本站观测时发现的,应立即重测;当迁站后发现超限时,应从稳固可靠的点开始重测。 2 当测段往返测高差较差超限时,应先对可靠性小的往测或返测测段进行重测,并应符合下列规定: 1)当重测的高差与同方向原测高差的不符值大于往返测高差不符值的限差,但与另一单程的高差不符值未超出限差时,可取用重测结果; 2)当同方向两高差的不符值未超出限差,且其算术平均值与另一单程原测高差的不符值亦不超出限差时,可取同方向两高差算术平均值作为该单程的高差; 3)当重测高差或同方向两高差算术平均值与另一单程高差的不符值超出限差时,应重测另一单程; 4)当出现同向不超限但异向超限时,若同方向高差不符值小于限差的1/2,可取原测的往返高差算术平均值作为往测结果,取重测的往返高差算术平均值作为返测结果。 3单程双测站所测高差较差超限时,可只重测一个单线,并应与原测结果中符合限差的一个单线取算术平均值采用。若重测结果与原测结果均符合限差时,可取三个单线的算术平均值。当重测结果与原测两个单线结果均超限时,应再重测一个单线。 4 当线路往返测高差较差、附合路线或环线闭合差超限时,应对路线上可靠性小的测段进行重测。 4.3静力水准测量 4.3.1静力水准测量可用于自动化沉降观测。应根据观测精度要求和预估沉降量,选取相应精度和量程的静力水准传感器。对一等、二等沉降观测,宜采用连通管式静力水准;对二等及以下等级沉降观测,可采用压力式静力水准。采用静力水准测量进行沉降观测,宜将传感器稳固安装在待测结构上。 4.3.2 一组静力水准测量系统可由一个参考点和多个监测点组成。当采用多组串联方式构成观测路线时,在相邻组的交接处,应在同一建筑结构的上下位置设置转接点。当观测范围小于300m,且转接点数不大于2个时,可将一端的参考点设置在相对稳定的区域作为工作基点;否则,宜在观测路线的两端分别布设工作基点。工作基点应采用水准测量方法定期与基准点联测。 4.3.3静力水准观测的技术要求应符合表4.3.3的规定。 表4.3.3静力水准观测技术要求(mm) 沉降观测等级 一等 二等 三等 网等 传感器标称精度 ≤0.1 ≤0.3 ≤1.0 ≤2.0 两次观测高差较差限差 0.3 1.0 3.0 6.0 环线及附合路线闭合差限差 0.3 1.0 3.0 6.0 注:n为高差个数。 4.3.4静力水准测量装置的安装应符合下列规定: 1管路内液体应具有流动性。 2观测前向连通管内充水时,可采用自然压力排气充水法或人工排气充水法,不得将空气带入,管路应平顺,管路不应出现Ω形,管路转角不应形成滞气死角。 3安装在室外的静力水准系统,应采取措施保证全部连通管管路温度均匀,避免阳光直射。 4对连通管式静力水准,同组中的传感器应安装在同一高度,安装标高差异不得消耗其量程的20%;管路中任何一段的高度均应低于蓄水罐底部,但不宜低于0.2m。 4.3.5静力水准测量系统的数据采集与计算应符合下列规定: 1 观测时间应选在气温最稳定的时段,观测读数应在液体完全呈静态下进行。 2每次观测应读数3次,读数较差应小于表4.3.3中相应等级的仪器标称精度,取读数的算术平均值作为观测值。 3多组串联组成静力水准观测路线时,应先按测段进行闭合差分配后计算各组参考点的高程,再根据参考点计算各监测点的高程。 4.3.6静力水准测量系统应与水准测量进行互校。使用期间应定期维护,发现性能异常时应及时修复或更换。 4.4三角高程测量 4.4.1 基于全站仪的三角高程测量可用于三等、四等沉降观测。三角高程测量应采用中间设站观测方式,所用全站仪的标称精度应符合表4.4.1的规定,并宜采用高低棱镜组及配件。 表4.4.1 三角高程测量所用全站仪标称精度要求 沉降观测 等级 一测回水平方向标准差 (″) 测距中误差 (mm) 三等 ≤1.0 ≤(1mm+1ppm) 四等 ≤2.0 ≤(2mm+2ppm) 注:1ppm表示每千米1mm,2ppm表示每千米2mm,下同。 4.4.2三角高程测量,应符合下列规定: 1应在后视点、前视点上设置棱镜,在其中间设置全站仪。观测视线长度不宜大于300m,最长不宜超过500m,视线垂直角不应超过20°。每站的前后视线长度之差,对三等观测不宜超过30m,四等观测不宜超过50m。 2视线高度及离开障碍物的间距宜大于1.3m。 3当采用单棱镜观测时,每站应变动1次仪器高进行2次独立测量。当2次独立测量所计算高差的较差符合表4.4.2的规定时,取其算术平均值作为最终高差值。 表4.4.2两次测量高差较差限差 沉降观测等级 两次测景高差较差限差(mm) 三等 10 四等 20 注:D为两点间距离,以km为单位。 4 当采用高低棱镜组观测时,每站应分别以高、低棱镜中心为照准目标各进行1次距离和垂直角观测;观测宜采用全站仪自动照准和跟踪测量功能按自动化测量模式进行;当分别以高、低棱镜中心所测成果计算高差的较差符合表4.4.2的规定时,取其算术平均值作为最终高差值。 4.4.3三角高程测量中的距离和垂直角观测,应符合下列规定: 1 每次距离观测时,前后视应各测2个测回。每测回应照准目标1次、读数4次。距离观测应符合表4.4.3-1的规定。 表4.4.3-1 距离观测要求 全站仪测距 标称精度 一测回读数间 较差限差 (mm) 测回间 较差限差 (mm) 气象数据测定 最小读数 温度 (℃) 气压 (mmHg) 1mm+1ppm 3 4.0 0.2 0.5 2mm+2ppm 5 7.0 0.2 0.5 2每次垂直角观测时,应采用中丝双照准法观测,观测测回数及限差应符合表4.4.3-2的规定。 表4.4.3-2垂直角观测要求 全站仪测角 标称精度 测回数 两次照准 目标读数差限差 (″) 垂直角 测回差限差 (″) 指标差 较差限差 (″) 三等 四等 0.5″ 2 1 1.5 3 3 1″ 4 2 4 5 5 2″ — 4 6 7 7 3观测宜在日出后2h至日落前2h的期间内目标成像清晰稳定时进行,阴天和多云天气可全天观测。 4.4.4三角高程测量单次观测的高差应按下式计算: (4.4.4) 式中:h12——后视点与前视点之间的高差(m); D1、D2——后视、前视水平距离(m); α1、α2——后视、前视垂直角; R——地球平均曲率半径(m); K1、K2——后视、前视大气垂直折光系数; v1、v2——后视、前视棱镜高(m)。 4.5全站仪测量 4.5.1全站仪边角测量法可用于位移基准点网观测及基准点与工作基点间的联测;全站仪小角法、极坐标法、前方交会法和自由设站法可用于监测点的位移观测;全站仪自动监测系统可用于日照、风振变形测量,以及监测点数量多、作业环境差、人员出入不便的建筑变形测量项目。 4.5.2位移观测所用全站仪的标称精度应符合表4.5.2的规定。 表4.5.2全站仪标称精度要求 位移观测等级 一测回水平方向标准差 (″) 测距中误差 (mm) 一等 ≤0.5 ≤(1mm+1ppm) 二等 ≤1.0 ≤(1mm+2ppm) 三等 ≤2.0 ≤(2mm+2ppm) 四等 ≤2.0 ≤(2mm+2ppm) 4.5.3 当采用全站仪边角测量法进行位移基准点网观测及基准点与工作基点间联测时,应符合下列规定: 1基准点及工作基点应组成多边形网,网的边长宜符合表4.5.3的规定。 表4.5.3基准点及工作基点网边长要求 位移观测等级 边长(m) 一等 ≤300 二等 ≤500 三等 ≤800 四等 ≤1000 2应在各基准点、工作基点上设站观测,观测应边角同测。 3视线高度及离开障碍物的间距宜大于1.3m。 4.5.4全站仪水平角观测应符合下列规定: 1水平角观测应采用方向观测法,测回数应符合表4.5.4-1的规定,观测限差应符合表4.5.4-2的规定。 表4.5.4-1水平角观测测回数 全站仪测角 标称精度 位移观测等级 一等 二等 三等 四等 0.5″ 4 2 1 1 1″ — 4 2 1 2″ — — 4 2 表4.5.4-2水平角观测限差 全站仪测角 标称精度 半测回归零 差限差 (″) 一测回内 2C互差限差 (″) 同一方向值 各测回互差限差 (″) 0.5″ 3 5 3 1″ 6 9 6 2″ 8 13 9 2观测应在通视良好、成像清晰稳定时进行。晴天的日出、日落前后和太阳中天前后不宜观测。作业中仪器不得受阳光直接照射,当气泡偏离超过一格时,应在测回间重新整置仪器。当视线靠近吸热或放热强烈的地形地物时,应选择阴天或有风但不影响仪器稳定的时间进行观测。 3每站观测中,宜避免二次调焦。当观测方向的边长悬殊较大需调焦时,宜采用正倒镜同时观测法,该方向的2C值可不参与互差计算。对于大倾角方向的观测,水平气泡偏移不应超过一格。 4 当水平角观测成果超出限差时,应按下列规定进行重测: 1)当2C互差或各测回互差超限时,应重测超限方向,并联测零方向; 2)当归零差或零方向的2C互差超限时,应重测该测回; 3)一测回中,当重测方向数超过所测方向总数的1/3时,应重测该测回; 4)一个测站上,当重测的方向测回数超过全部方向测回总数的1/3时,应重测该测站所有方向。 4.5.5全站仪距离观测应符合下列规定: 1一等位移观测,距离应往返各观测4个测回;二等、三等、四等位移观测,距离应往返各观测2个测回。每测回应照准目标1次、读数4次。有关技术要求应符合表4.5.5的规定,其中往返测观测值较差应将斜距化算到同一水平面上方可比较。 表4.5.5距离观测技术要求 全站仪测距 标称精度 一测回读数间 较差限差 (mm) 测回间 较差限差 (mm) 往返测 较差限差 (mm) 气象数据测定 最小读数 温度 (℃) 气压(mmHg) 1mm+1ppm 3 4.0 6.0 0.2 0.5 1mm+2ppm 4 5.5 8.0 0.2 0.5 2mm+2ppm 5 7.0 10.0 0.2 0.5 2测距应在成像清晰、气象条件稳定时进行。阴天、有微风时可全天观测;晴天最佳观测时间宜为日出后1h和日落前1h;雷雨前后、大雾、大风、雨、雪天和大气透明度很差时,不应进行观测。 3 晴天作业时,应对全站仪和反光镜打伞遮阳,严禁将仪器照准头对准太阳。 4观测时的气象数据测定,应采用经检定合格的温度计和气压计。气象数据应在每边观测始末时在两端进行测定,取其算术平均值。 5测距边两端点的高差,对一等、二等观测可采用四等水准测量或三等三角高程测量方法测定;对三等、四等观测可采用四等三角高程测量方法测定。 6测距边归算到水平距离时,应在观测的斜距中加入气象改正和仪器加常数、乘常数、周期误差改正,并化算到同一水平面上。 7 当距离观测成果超限时,应按下列规定进行重测: 1)当一测回读数间较差超限时,应重测该测回; 2)当测回间较差超限时,可加测2个测回,去掉其中最大、最小测回观测值后再进行比较,如仍超限,应重测该边的所有测回; 3)当往返测较差超限时,应分析原因,重测单方向的距离。如重测后仍超限,应重测往返两方向的距离。 4.5.6当采用全站仪小角法测定某个方向上的水平位移时,应符合下列规定: 1应垂直于所测位移方向布设视准线,并应以工作基点作为测站点。 2测站点与监测点之间的距离宜符合表4.5.6的规定。 表4.5.6全站仪小角法观测距离要求(m) 全站仪测角 位移观测等级 标称精度 一等 二等 三等 四等 0.5″ ≤300 ≤500 ≤800 ≤1200 续表4.5.6 全站仪测角 位移观测等级 标称精度 一等 二等 三等 四等 1″ — ≤300 ≤500 ≤800 2″ — — ≤300 ≤500 3监测点偏离视准线的角度不应超过30′。 4每期观测时,利用全站仪观测各监测点的小角值,观测不应少于1测回。 5监测点偏离视准线的垂直距离d(图4.5.6)应按下式计算: d=α/ρ×D (4.5.6) 式中:α——偏角(″); D——监测点至测站点之间的距离(mm); ρ——常数,其值为206265″。 |
联系我们
|
微信联系客服
![]() |
关于我们 | 联系我们 | 收费付款 |
服务热线:400-001-5431 | 电话:010-8572 5110 | 传真:010-8581 9515 | Email: bz@bzfyw.com | |
版权所有: 北京悦尔信息技术有限公司 2008-2020 京ICP备17065875号-1 51La |
本页关键词: |
JGJ 8-2016, JGJ/T 8-2016, JGJT 8-2016, JGJ8-2016, JGJ 8, JGJ8, JGJ/T8-2016, JGJ/T 8, JGJ/T8, JGJT8-2016, JGJT 8, JGJT8 |