1.0.1 This code is formulated to implement relevant national principles and policies, standardize construction requirements, unify inspection method and define acceptance standard so as to ensure construction and installation quality and to achieve energy saving, material and water conservation, environmental protection and safety operation during the construction and acceptance of cleanrooms and associated controlled environment (referred to as cleanroom from Chapter 3).
1.0.2 This code is applicable to the construction and acceptance of newly-built and reconstructed, entire and assembling as well as fixed and moving cleanrooms and associated controlled environment.
1.0.3 The construction and acceptance of cleanrooms and associated controlled environment shall meet the following requirements:
1 It shall be carried out by professional qualified construction enterprise approved by competent development department according to approved documents and drawings. The constructors shall receive training and assessment on construction and acceptance specification of cleanroom; the special category of workers shall have work license and shall be supervised all over the process by supervision organization with professional supervision aptitude and specialized training.
2 Construction organization design shall be formulated before construction. During construction, different categories of workers shall be keep close coordination and carry out construction according to the specified procedure. No construction shall be carried out for engineering projects without drawings, technical requirements and construction organization design. The change file from design unit shall be provided during engineering construction to modify the design. No performance acceptance shall be carried out on engineering projects without completion drawing.
3 The specification, model, performance and technical index of all materials, equipments, finished products and semi-finished products used in projects shall meet the requirements of design and current relevant national standards, and there shall be complete legal quality evidentiary documents. Inspection must be carried out if there is any doubt on their quality. The overdue materials shall not be used any more.
4 After finishing complex procedure construction of section subitem project and engineering, it shall carry out section acceptance. If the section acceptance is unqualified, it must be reworked until qualified and shall be recorded and filed.
1.0.4 This code shall be used together with the current national standard "Unified Standard for Constructional Quality Acceptance of Building Engineering" (GB 50300).
The construction and acceptance of cleanrooms and associated controlled environment shall not only comply with the requirements stipulated in this code, but also shall meet those in the relevant current ones of the nation.
Contents
1 General
2 Terms
3 Building Structure
3.1 General Provisions
3.2 Structure Construction Requirements
3.3 Section Acceptance
4 Building Decoration
4.1 Building Decoration
4.2 Ground
4.3 Wall Surface
4.4 Suspended Ceiling
4.5 Wall Corner
4.6 Door and Window
4.7 Seal Gap
4.8 Section Acceptance
5 Air System
5.1 General Provisions
5.2 Duct and Fitting Manufacture
5.3 Duct Installation
5.4 Parts and Accessories Installation
5.5 Air Outlet Installation
5.6 Supply Air Terminal Installation
5.7 Section Acceptance
6 Gas System
6.1 General Provisions
6.2 Pipe and Accessory
6.3 Pipeline System Installation
6.4 Strength Test of Pipeline System
6.5 The Ablution of Pipeline System
6.6 Gas Supply Unit
6.7 Section Acceptance
7 Water System
7.1 General Provisions
7.2 Water Supply
7.3 Drainage
7.4 Hot Water
7.5 Purified Water and High Purity Water
7.6 Section Acceptance
8 Chemical Materials Supply System
8.1 General Provisions
8.2 Storage Facility
8.3 Pipeline and Components
8.4 Section Acceptance
9 Power Distribution System
9.1 General Provisions
9.2 Wiring
9.3 Electrical Equipment and Device
9.4 Section Acceptance
10 Automatic Control System
10.1 General Provisions
10.2 Automatic Control Equipment Installation
10.3 Pipeline Construction of Automatic Control Equipment
10.4 Integrated Debugging of Automatic Control Equipment
10.5 Section Acceptance
11 Device Installation
11.1 General Provisions
11.2 Purification Device Installation
11.3 Air-conditioning Equipment and Cold and Heat Source Device Installation in the Equipment Level
11.4 Biosafety Cabinet Installation
11.5 Process Equipment and Facility
11.6 Section Acceptance
12 Fire Control System
12.1 General Provisions
12.2 Smoke Control System
12.3 Fire Curtain, Fire Door and Fire Window
12.4 Emergency Lighting and Dispersal Indicator
12.5 Section Acceptance
13 Shielding Facility
13.1 General Provisions
13.2 Shield
13.3 Shielding Room
13.4 Pipeline, Door Type Tunnel and Other Requirements
13.5 Section Acceptance
14 Antistatic Facilities
14.1 General Provisions
14.2 Antistatic Floor
14.3 Antistatic Terrazzo Floor
14.4 Antistatic PVC Floor
14.5 Antistatic Porcelain Tile Floor
14.6 Surface Course and Coating
14.7 System Components
14.8 Section Acceptance
15 Construction Organization and Management
15.1 General Provisions
15.2 Staff and File
15.3 Construction Measures
15.4 Safety Measures
15.5 Environmental Protection and Energy Conservation
16 Project Test
16.1 General Provisions
16.2 Test Items
16.3 Test Period
16.4 Performance Test
17 Acceptance
17.1 General Provisions
17.2 Section Acceptance Period
17.3 Completion Acceptance Period
17.4 Performance Acceptance Period
17.5 Project Acceptance
17.6 Operation Acceptance
Appendix A Air Duct Leak Test Method
A.1 Test Equipment
A.2 Test Method
A.3 Air Leakage Rate Calculation of Pipe Section
Appendix B Construction Inspection Tables
Appendix C Construction Acceptance Tables
Appendix D In Situ Leak Scan Test of HEPA Fitters
D.1 Principle
D.2 Photometer Method
D.3 Particle Counter Method
D.4 The Generation of Leak Test Aerosol
Appendix E The Comprehensive Performance Test Method of Clean Room
E.1 Air Volume and Air Velocity Test
E.2 Static Pressure Difference Test
E.3 The Unevenness Test of Cross-sectional Air Velocity in Unidirectional Clean Room
E.4 Particle Count Test
E.5 Temperature and Humidity Test
E.6 Sound Level Test
E.7 Illumination Test
E.8 Airborne Microorganism Test
E.9 Surface Conductivity Test
E.10 Vibration Test
E.11 Recovery Time Test
E.12 Airflow Test
E.13 Formaldehyde Concentration Test
E.14 Ammonia Concentration Test
E.15 Ozone Concentration Test
E.16 Carbondioxide Concentration Test
Appendix F Biological Evaluation Method
F.1 Microbe Transmittance of Return and Exhaust High Efficiency Particulate Air Filter Air Outlet
F.2 The Inhibition Ability Evaluation of the Local Leak Diffusion of Microbiological Aerosol
F.3 Isolation Coefficient of Biosafety Cabinet
Appendix G Test Method for Cleanroom Airtight
G.1 Principle
G.2 Pressure-decay Method
G.3 Constant Pressure Method
G.4 Safety Requirements
Appendix H Airborne Molecular Contamination Test
H.1 Airborne Molecular Contamination (AMC)
H.2 Test Method
H.3 Impact Sampling Method
H.4 Adsorbent Tube Sampling Method
Explanation of Wording in This Code
List of Quoted Standards