![]() |
中标分类
行业分类
ICS分类
最新标准
|
登录注册 |
您的位置: 标准明细 |
1 General provisions 1.0.1 This specification is developed to ensure safety, reliability, advanced technology, economy and rationality and the safe surrounding environment in the investigation, design, construction, monitoring and testing for building foundation excavation. 1.0.2 This specification is applicable to the investigation, design, construction, monitoring and testing for the retaining and protection for temporary building foundation pit under general geological conditions in Guangdong. 1.0.3 For building foundation excavation, the engineering practice shall be combined with the surrounding environmental conditions to achieve reasonable design, careful construction, strict monitoring and testing. 1.0.4 In addition to this specification, the building foundation excavation shall also meet the requirements of the relevant current national and professional standards, as well as the relevant management regulations and technical specifications. 2 Terms and symbols 2.1 Terms 2.1.1 building foundation pit pit or trench to be excavated underground for the foundation or basement construction of buildings (structures) 2.1.2 retaining and protection for foundation pit measures of retaining, strengthening, protection and groundwater control adopted for building foundation pit to endure the safety of underground structure construction and surroundings around foundation pit 2.1.3 surroundings around foundation pit buildings (structures) within the influence range of foundation excavation, including houses, roads, underground facilities and pipelines, rivers, cultural relics and historical sites, etc., as well as rock, soil and adjacent underground waters 2.1.4 ultimate limit states critical states when the supporting structure reaches the ultimate bearing capacity or before the loss of bearing capacity of the retaining and protection structure due to soil instability 2.1.5 serviceability limit states critical states before the hindrance of normal construction of underground structure or normal use of surroundings around foundation pit caused by excessive supporting structure or soil deformation or failure of water interception measures 2.1.6 retaining and protection structure structural system that provides retaining resistance and ensures the safety of the foundation pit 2.1.7 side of foundation pit vertical structure of retaining and protection structure, including row piles, diaphragm wall, soil nailing wall and gravity cement-soil wall 2.1.8 embedded depth buried depth of pile and wall retaining and protection structure below the excavation surface of foundation pit 2.1.9 capping beam concrete structure coupling beam set on the top of the side of foundation pit 2.1.10 waling concrete beam or steel beam which is arranged on the profile of the side of foundation pit and transfers the pivot point force of retaining and protection structure and support 2.1.11 pivot point horizontal constraint point of anchor, strut or other elements for retaining and protection structure 2.1.12 pivot horizontal stiffness ratio of horizontal force of anchor or strut on retaining and protection structure to its displacement 2.1.13 anchor tensile rod composed of steel bars or steel strands which are arranged in the drill hole, set with free section and anchorage section and extended into the stable rock-soil layer, and grouting body in the drill hole 2.1.14 strut structural system arranged in the foundation pit to apply horizontal force on the side of foundation pit 2.1.15 (composite) soil nailing wall soil nailing wall: retaining and protection structure formed by the cooperation of soil nailing, sprayed concrete surface, reinforced in-situ rock (soil) and necessary waterproof and drainage system; composite soil nailing wall: composite retaining and protection structure formed by the combination of soil nailing wall and one or more of pre-stressed anchor, curtain for cutting of water and miniature pile 2.1.16 gravity cement-soil wall column reinforced cement-soil solid, which is continuously overlapped and formed by curing agent (cement-based material) mixed with or partially replacing in-situ soil through stirring and high-pressure jet grouting 2.1.17 miniature pile small-diameter pile, including concrete pile, steel pile, reinforced cement-soil pile, which is installed in (composite) soil nailing wall, gravity cement-soil walls or excavated slope soils for forepoling to improve the strength and stability of retaining and protection structure 2.1.18 groundwater control measures such as open pumping, dewatering, water interception or recharge taken for normal construction and prevention from the adverse impact of groundwater changes on the surroundings around foundation pit 2.1.19 curtain for cutting off drains vertical diaphragm wall used to prevent or reduce water outside the foundation pit and groundwater under the pit from flowing into it 2.1.20 mildtype well point dewatering water absorption and dewatering by embedding 40mm to 80mm diameter steel pipe with a filter screen at the head into the ground, and using a vacuum pump (jet pump) or a jet device at the head to make vacuum 2.1.21 tube wells well point dewatering dewatering by embedding a large diameter steel pipe or plastic pipe wrapped with filter screen underground to make a deep well, equipped with submersible pump 2.2 Symbols 2.2.1 Physical and mechanical indexes of soil c, ——the characteristic values of cohesion and internal friction angle of soil; k——the permeability coefficient of aquifer; Ka——the coefficient of active soil pressure; Kp——the coefficient of passive soil pressure; ——the natural unit weight of soil; i——the average natural unit weight of the i-th layer of soil; mh——the weighted average natural unit weight of soil; w——the unit weight of water; ak——the weighted average of equivalent internal friction angle of soil 2.2.2 Physical and mechanical indexes of material A——the sectional area of material; As, Ap, Asy——the sectional areas of general steel bars, prestressed steel bars and steel strands; Es——the elastic modulus of steel; fc——the design value of axial compressive strength of concrete; fcs——the design value of axial compressive strength of cement-soil at excavation age; fy and fpy——the design tensile strength of general steel bar and prestressed steel bar; K——the stiffness of material; qsk——the characteristic value of the ultimate bond strength of the interface between the anchor or soil nail and the rock and soil; W——the section modulus of material; ——the design value of shear strength of material; ——the design value of bond strength of concrete. 2.2.3 Actions and effects eaik——the characteristic value of horizontal load of retaining and protection structure; epik——the characteristic value of horizontal resistance inside foundation pit; Ea——the resultant force of characteristic values of horizontal load of retaining and protection structure; Ep——the resultant force of characteristic values of horizontal resistance of rock and soil inside foundation pit; G——the self-weight of structure; M——the design value of bending moment of section; N——the design value of axial force of section; Nu——the characteristic value of axial ultimate tension of anchor; Nt——the calculated value of axial tension of anchor; p——the characteristic value of additional pressure at the bottom of foundation; q0——the uniformly distributed load acting on the ground outside the retaining and protection structure; q——the distributed load on the ground outside the foundation pit or additional distributed load under the adjacent building foundation; T——the design value of horizontal tension of anchor; V——the design shear of section; aik——the characteristic value of vertical stress acting at depth zi; pik——the characteristic value of vertical stress acting at the depth zi below the bottom of foundation pit; rk——the vertical stress caused by the self-weight of soil; 0k——the vertical stress in soil caused by uniformly distributed ground load; 1k——the vertical stress in soil caused by local ground load. 2.2.4 Geometric parameters a——the distance between the foundation edge and the retaining and protection structure; b——the width of structure; B——the width of foundation pit; dh——the embedded depth of foundation; d——the steel diameter; D——the pile diameter; hw——the depth of groundwater level; hi——the thickness of the i-th layer of soil; hd——the design value of embedding depth; H——the excavation depth of foundation pit; l——the length of foundation bottom; L——the length of foundation pit; q——the design water yield of single well; Q——the water inflow of foundation pit; r0——the equivalent radius of foundation pit; rw——the radius of single well; R——the influence radius of dewatering well; s——the design dewatering depth of groundwater level; sw——the calculated dewatering depth of pumping well point, sw≥s; V——the volume of water discharge; z——the depth from the top of wall to the calculated section; α——the inclination angle between the soil nailing or prestressed anchor and the horizontal plane; β——the included angle between slope and horizontal plane of soil nailing wall; ——the inclination angle between anchor and vertical plane. 2.2.5 Calculation parameters kr——the horizontal stiffness of elastic pivot point; K——the safety coefficient; Ks——the overall stability safety coefficient; Kt——the safety coefficient of anchor pullout; Km——the safety coefficient of anchor; n——the number of well points; n'——the porosity of filter tube; α——the internal force coefficient, 1/16 for continuous beam and 1/8 for simply supported beam; l——the safety coefficient of stability against uplift; 0——the importance coefficient of foundation pit; k——the partial coefficient of overall stability; s——the partial coefficient of axial tensile resistance of anchor; t——the pile type adjustment factor of allowable hold-type pile pressing force of pressing precast concrete pile; ——the reduction factor of axial load on soil nail; ——the reduction factor of combined action of anti-sliding moments generated by each retaining and protection body; ——the friction coefficient between structure and soil; v——the velocity of groundwater entering the filter tube. Foreword ii 1 General provisions 2 Terms and symbols 2.1 Terms 2.2 Symbols 3 Basic requirements 3.1 Environmental investigation and protection 3.2 Design requirements 3.3 Construction requirements 3.4 Detection and monitoring 4 Geotechnical engineering investigation 4.1 General requirements 4.2 Investigation requirements and environmental investigation 4.3 Investigation report 5 Calculation of horizontal load and resistance of retaining and protection structure for foundation pit 5.1 General requirements 5.2 Determination of the characteristic value of horizontal load 5.3 Determination of the characteristic value of horizontal resistance 5.4 Geotechnical parameter value 5.5 Structural calculation 5.6 Cross section bearing capacity calculation 5.7 Stability calculation of support structure 6 Retaining and protection of slope ratio method 6.1 General requirements 6.2 Design 6.3 Construction 7 Gravity cement-soil wall 7.1 General requirements 7.2 Design 7.3 Construction 8 Retaining and protection of row pile 8.1 General requirements 8.2 Design 8.3 Construction 9 Retaining and protection of diaphragm wall 9.1 General requirements 9.2 Design 9.3 Construction 10 Retaining and protection of soil nailing wall and composite soil nailing wall 10.1 General requirements 10.2 Design 10.3 Construction 11 Retaining and protection of steel sheet pile 11.1 General requirements 11.2 Design 11.3 Construction 12 Retaining and protection of double-row pile 12.1 General requirements 12.2 Design 12.3 Construction 13 Strut 13.1 General requirements 13.2 Design 13.3 Construction 14 Anchor 14.1 General requirements 14.2 General anchor design 14.3 General anchor construction 14.4 Design and construction of reaming anchor 14.5 Design and construction of recoverable anchor 15 Reversed construction method 15.1 General requirements 15.2 Design 15.3 Construction 16 Center island method 16.1 General requirements 16.2 Design 16.3 Construction 17 Excavation and backfilling of foundation pit 17.1 General requirements 17.2 Excavation 17.3 Backfilling 18 Groundwater control 18.1 General requirements 18.2 Open ditches drainage of foundation pit 18.3 Foundation pit dewatering 18.4 Water interception of foundation pit 18.5 Special rock and soil foundation pit basement treatment 19 Foundation pit monitoring and testing 19.1 General requirements 19.2 Monitoring 19.3 Inspection and acceptance 20 Assessment and prevention of environmental impact of foundation pit excavation 20.1 General requirements 20.2 Assessment of environmental impact of foundation pit dewatering 20.3 Assessment of environmental impact of support 20.4 Prevention and control of environmental impact of foundation Appendix A (Normative) Incremental method for pile-wall retaining structure Appendix B (Informative) Determination method of deformation modulus of soil Appendix C (Normative) Circular sliding method Appendix D (Normative) Calculation of bend bearing capacity of normal section Appendix E (Normative) Simplified calculation for water discharge in excavation pit Appendix F (Normative) Kernel of soil nail pullout test Appendix G (Normative) Anchor test Explanation of wording in this specification List of quoted standards 1 总则 1.0.1 为了在建筑基坑工程的勘察、设计、施工、监测与检测工作中做到安全可靠、技术先进、经济合理、保证周边环境安全,制定本规程。 1.0.2 本规程适用于广东地区一般地质条件下临时性建筑基坑支护工程的勘察、设计、施工、监测与检测。 1.0.3 建筑基坑工程应结合工程实际与周边环境条件,做到合理设计、精心施工、严格监测和检测。 1.0.4 建筑基坑工程除应执行本规程的规定外,还应符合国家、行业现行有关标准的规定及广东省的有关管理和技术规定。 2 术语和符号 2.1 术语 2.1.1 建筑基坑 building foundation pit 建(构)筑物基础或地下室施工所需要开挖的地面以下的坑、槽。 2.1.2 基坑支护 retaining and protection for excavations 为保护地下结构施工和基坑周边环境的安全,对建筑基坑采用的支挡、加固、保护与地下水控制的措施。 2.1.3 基坑周边环境 surroundings around excavations 基坑开挖影响范围内的建(构)筑物,包括房屋、道路、地下设施和管线、河道、文物古迹等,以及岩土体和邻近地下水体的统称。 2.1.4 承载能力极限状态 ultimate limit states 支护结构达到极限承载能力或由于土体失稳导致支护结构承载能力丧失之前的临界状态。 2.1.5 正常使用极限状态 serviceability limit states 支护结构、土体变形过大或截水措施失效,妨碍地下结构的正常施工或影响基坑周边环境的正常使用之前的临界状态。 2.1.6 支护结构 retaining and protection structure 为建筑基坑提供支挡抗力、保证基坑安全的结构体系。 2.1.7 基坑侧壁 side of excavations 支护结构挡土的竖向结构体,包括排桩、地下连续墙、土钉墙和重力式挡土墙等。 2.1.8 嵌固深度 embedded depth 桩墙支护结构在基坑开挖面以下的埋置深度。 2.1.9 冠梁 capping beam 设置在基坑侧壁顶部的混凝土结构连梁。 2.1.10 腰梁 waling 设置在基坑侧壁侧面的传递支护结构与支撑支点力的混凝土梁或钢梁。 2.1.11 支点 pivot point 锚杆或内支撑等对支护结构的水平约束点。 2.1.12 支点水平刚度 pivot horizontal rigidity stiffness 锚杆或内支撑等对支护结构的水平作用力与其位移的比值。 2.1.13 锚杆 anchor 由置于钻孔内,设置有自由段、锚固段,伸入稳定岩土层中的钢筋或钢绞线与孔内注浆体组成的受拉杆体。 2.1.14 内支撑strut 设置于基坑内为基坑侧壁提供水平力的结构体系。 2.1.15 (复合)土钉墙 (composite) soil nailing wall 土钉墙是由设置于边坡中的土钉、喷射混凝土面层、被加固的原位岩(土)体及必要的防排水系统共同工作所形成的支护结构;复合土钉墙是土钉墙与预应力锚杆、截水帷幕、微型桩等构件中的一种或几种联合形成的复合型支护结构。 2.1.16 水泥土重力式挡土墙 gravity cement-soil wall 以水泥系材料为固化剂,通过搅拌、高压喷射注浆等方法将固化剂掺入或部分置换原位土体,形成连续搭接的水泥土柱状加固体。 2.1.17 微型桩 miniature pile 设置于(复合)土钉墙、水泥土重力式挡土墙或开挖边坡土体中起超前支护作用,以提高支护结构强度和稳定性的小直径桩,包括混凝土桩、钢桩、插筋水泥土桩等。 2.1.18 地下水控制 groundwater control 为保证工程正常施工及防止地下水变化对基坑周边环境产生不利影响而采取的集水明排、降水、截水或回灌等措施。 2.1.19 截水帷幕 curtain for cutting off drains 用于阻止或减少基坑侧壁外及基坑底地下水涌入基坑而采用的竖向连续墙体。 2.1.20 轻型井点降水 mildtype well point dewatering 用直径40mm~80mm头部带滤网的钢管埋入地下,在地面使用真空(射流)泵或头部带射流器形成真空进行吸水降水的方法。 2.1.21 管井井点降水 tube wells well point dewatering 用直径较大的钢管或塑料管外包过滤网,埋入地下形成深井,内置潜水泵的降水方法。 2.2 符 号 2.2.1 土的物理力学指标 c、——土体的黏聚力、内摩擦角标准值; k——含水层渗透系数; Ka——主动土压力系数; Kp——被动土压力系数; ——土的天然重度; i——第i层土的平均天然重度; mh——土的加权平均天然重度; w——水的重度; ak——土的等效内摩擦角加权平均值。 2.2.2 材料物理力学指标 A——材料截面面积; As、Ap、Asy——普通钢筋、预应力钢筋、钢绞线的截面面积; Es——钢材弹性模量; fc——混凝土的轴心抗压强度设计值; fcs——水泥土开挖龄期时的轴心抗压强度设计值; fy、fpy——普通钢筋、预应力钢筋抗拉强度设计值; K——材料刚度; qsk——锚杆或土钉与岩土体界面的极限粘结强度标准值; W——材料截面模量; ——材料抗剪强度设计值; ——混凝土粘结强度设计值。 2.2.3作用和作用效应 eaik——支护结构水平荷载标准值; epik——基坑内侧水平抗力标准值; Ea——支护结构水平荷载标准值的合力; Ep——基坑内侧岩土水平抗力标准值的合力; G——结构自重; M——截面弯矩设计值; N——截面轴力设计值; Nu——锚杆轴向极限拉力标准值; Nt——锚杆轴向拉力计算值; p——基础底面处附加压力标准值; q0——支护结构外侧地面作用均布荷载; q——基坑外侧地面的分布荷载或邻近建筑基础下的附加分布荷载; T——锚杆水平拉力设计值; V——截面剪力设计值; aik——作用于深度zi处的竖向应力标准值; pik——作用于基坑底面以下深度zi处的竖向应力标准值; rk——土体自重产生的竖向应力; 0k——地面均布荷载在土中产生的竖向应力; 1k——地面局部荷载在土中产生的竖向应力。 2.2.4 几何参数 a——基础边距支护结构的距离; b——结构体宽度; B——基坑宽度; dh——基础埋置深度; d——钢材直径; D——桩体直径; hw——地下水位深度; hi——第i层土的厚度; hd——嵌固深度设计值; H——基坑开挖深度; l——基础底面长度; L——基坑长度; q——设计单井出水量; Q——基坑涌水量; r0——基坑等效半径; rw——单井半径; R——降水井影响半径; s——地下水位设计降深; sw——抽水井点计算降深,sw≥s; V——排水量; z——由墙顶至计算截面的深度; α——土钉或预应力锚杆与水平面的倾角; β——土钉墙坡面与水平面的夹角; ——锚杆与垂直面的倾角。 2.2.5 计算参数 kr——弹性支点水平刚度; K——安全系数; Ks——整体稳定安全系数; Kt——锚杆抗拔安全系数; Km——锚杆杆体安全系数; n——井点个数; n′——滤管孔隙率; α——内力系数,对等跨连续梁取l/16,对简支梁取1/8; l——抗隆起稳定安全系数; 0——基坑重要性系数; k——整体稳定分项系数; s——锚杆轴向受拉抗力分项系数; t——静压桩抱压允许压桩力桩型调整系数; ——土钉所受轴向荷载的折减系数; ——各支护体产生的抗滑力矩组合作用时的折减系数; ——结构与土体的摩擦系数; v——地下水进入滤管的速度。 3 基本规定 3.1 环境调查与保护 3.1.1 基坑支护设计前应进行基坑周边环境调查和岩土工程勘察,以获取相关的资料作为设计和施工的依据。 3.1.2 设计应提出对环境进行保护的要求和监测的内容。 3.1.3 临水基坑应调查水流、水位、波浪及潮汐等情况。 3.2 设计规定 3.2.1 基坑支护设计应按表3.2.1的规定确定基坑周边环境等级和支护结构的水平位移控制值。 表3.2.1 基坑环境等级及其支护结构水平位移控制值 环境等级 适用范围 支护结构水平位移控制值 特殊要求 基坑开挖影响范围内存在地下管线、地铁站、变电站、古建筑等有特殊要求的建(构)筑物、设施 满足特殊的位移控制要求。基坑支护设计、施工、监测方案需得到周边特殊建(构)筑物、设施管理部门的同意 一级 基坑开挖影响范围内存在浅基础房屋、桩长小于基坑开挖深度的摩擦桩基础建筑、轨道交通设施、隧道、防渗墙、雨(污)水管、供水总管、煤气总管、管线共同沟等重要建(构)筑物、设施 位移控制值取30mm且不大于0.002H 二级 一级与三级以外的基坑 水平位移控制值取45mm~50mm且不大于0.004H 三级 周边三倍基坑开挖深度范围内无任何建筑、管线等需保护的建(构)筑物 水平位移控制值取60mm~100mm且不大于0.006H 注:1 H为基坑开挖深度; 2 基坑开挖影响范围一般取1.0H;当存在砂层、软土层时,开挖影响范围应适当加大至2.0H; 3 表中水平位移控制值与基坑开挖深度的关系需同时满足,取最小值; 4 特殊要求和一级基坑,应严格控制变形。二、三级基坑的位移,如基坑周边环境许可,则主要由支护结构的稳定来控制。 3.2.2 基坑支护设计应按表3.2.2的规定确定支护结构的安全等级和重要性系数。 表3.2.2 支护结构安全等级及其重要性系数 安全等级 破坏后果 等级范围描述 重要性 系数0 一级 对主体结构施工安全或基坑周边环境的影响很严重 l 基坑开挖深度大于14m 2 支护结构作为主体结构的一部分 3 基坑开挖影响范围内存在重要建(构)筑物、对变形敏感的建(构)筑物或需保护的重要管线 1.1 二级 对主体结构施工安全或基坑周边环境的影响严重 除一级和三级以外的基坑工程 1.0 三级 对主体结构施工安全或基坑周边环境的影响不严重 开挖深度小于6m,且周围环境无特别要求 0.9 注:基坑只要符合三项条件中的一项,即定为一级。 3.2.3 基坑支护设计应计算各构件的内力、基坑侧壁的位移,并验算支护结构局部稳定、整体稳定、抗滑移、抗隆起以及砂土抗管涌等,并取得下列设计成果: 1 支护体系的方案比较和选型; 2 基坑的稳定性验算; 3 支护结构的内力和变形计算; 4 环境影响分析与保护的技术要求; 5 支护结构施工图及施工要求; 6 土石方开挖技术要求; 7 基坑监测和检测要求; 8 地下水控制方案。 3.2.4 基坑支护结构应满足承载能力极限状态和正常使用极限状态的设计计算和验算要求。 1 承载能力极限状态 1) 支护结构构件或连接因超过材料强度或过度变形时的承载能力极限状态设计,应按下式计算: 0Sd≤Rd (3.2.4-1) 式中:0——支护结构重要性系数,应按本规程第3.2.2条的规定采用; Sd——作用基本组合的效应(轴力、弯矩等)设计值; Rd——结构构件的抗力设计值。 对临时性支护结构,作用基本组合的效应设计值应按下式计算: Sd=FSk (3.2.4-2) 式中:F——荷载分项系数,不应小于1.25; Sk——滑动力、滑动力矩、倾覆力矩、锚杆和土钉的拉力等作用标准值的效应。 2) 整体滑动、坑底隆起失稳、挡土构件嵌固段推移、锚杆与土钉拔动、支护结构倾覆与滑移、土体渗透破坏等稳定性计算与验算,均应符合下式要求: (3.2.4.3) 式中:Rk——抗滑力、抗滑力矩、抗倾覆力矩、锚杆和土钉的极限抗拔承载力等土的抗力标准值; K——安全系数。 2 正常使用极限状态 由支护结构水平位移、基坑周边建(构)筑物、地下管线、道路、地面沉降、地下水渗流等控制的正常使用极限状态设计,应符合下式要求: Sd≤C (3.2.4-4) 式中:Sd——作用标准组合的效应(位移、沉降等)设计值; C——支护结构水平位移、基坑周边建(构)筑物、地下管线、道路、地面的沉降、地下水渗流等的限值。 3.2.5 支护结构作为永久结构的一部分时应满足耐久性要求。 3.2.6 多种支护形式组合时相互之间的搭接应满足变形协调和局部稳定的要求。 3.2.7 临时基坑的设计使用年限,无内支撑的宜为一年,有内支撑的宜为二年。 3.3 施工规定 3.3.1 基坑施工前应完成以下工作: 1 取得基坑支护设计施工图,并通过图纸会审; 2 编制支护结构与土石方开挖专项施工方案。 3.3.2 采用新工艺、新设备、新材料、新方法的工程,或缺乏类似工程经验的项目,应先进行试验性施工,确定合适的施工工艺和施工参数。 3.3.3 施工工况应与设计工况一致,当需要更改时,应先经设计方认可。 3.3.4 施工过程应对土层进行取样并记录地质情况,当发现地质情况与岩土工程勘察资料或设计不符时,应报请设计单位确定是否进行设计变更。 3.3.5 施工过程应根据监测信息对设计与施工进行动态调整,实施动态设计和信息化施工。 3.3.6 土石方开挖时支撑应闭合,且支撑先支,土石方后挖。土石方开挖的坡度应满足土体稳定和对工程桩等保护的要求。 3.3.7 测量系统的平面控制点和水准控制点应采取可靠的保护措施,并且应定期复测和检查。 3.4 检测与监测规定 3.4.1 基坑支护结构的主要构件应进行施工质量检测。 3.4.2 基坑监测方案应提前编制。基坑开挖和地下主体结构施工过程应实时监测,并根据基坑岩土性状、支护结构变形和周围环境条件的变化及时调整监测方案。 4 岩土工程勘察 4.1 一般规定 4.1.1 一级基坑或地质条件复杂的二级基坑工程,应根据基坑设计和施工的要求,进行专项的岩土工程勘察。勘察成果报告应提供基坑设计需要的岩土参数,并对基坑工程进行分析评价。 4.1.2 基坑支护工程勘察前,宜取得以下资料: l 拟建建筑物的红线图及总平面图; 2 拟建建筑物场地地面高程、±0.000的高程、基坑底面高程、基坑外轮廓线,建筑物基础平面图和桩基设计图等; 3 建筑物存在核心筒或其他构造形成坑中坑的底面高程; 4 基坑周边环境资料等。 4.1.3 基坑工程的岩土工程勘察应查明以下主要问题: 1 查明场地所在地貌单元、地层时代、成因、地层结构及其水平、垂直方向分布规律; 2 提供各岩土层的物理力学性质指标; 3 查明岩质边坡岩体的岩性、产状、风化程度,结构面(尤其是外倾软弱面)的类型及其力学性质、发育程度,查明基坑开挖影响范围内是否有构造破碎带或软弱夹层。 4.2 勘察要求与环境调查 4.2.1 勘察点宜主要布置于基坑开挖边界线上,并适量布置于开挖边界线外2倍~3倍开挖深度范围。开挖边界线外无法进行勘探的区域应进行调查并收集相应的资料。 4.2.2 勘探点间距应视地层复杂程度而定,一般为15m~25m,但每一条侧边勘探点不宜少于3个。存在暗沟、暗塘、岩溶、花岗岩风化球等地层结构突变的特殊地层应适当加密勘探点,进一步查明其分布及工程特性。 4.2.3 勘探点的深度不宜小于2.0倍基坑开挖深度,并应穿过主要的软弱土层和含水层。当2.0倍基坑开挖深度内遇微风化岩时,控制性勘探点可钻入微风化岩3.0m~5.0m,一般性勘探点可钻入微风化岩1.0m~2.0m。每一条侧边控制性勘探点的数量不宜少于该侧边勘探点数的1/3;当基坑开挖面以上有软弱沉积岩出露时,控制性钻孔应进入基坑底面以下3.0m~5.0m。 4.2.4 基坑工程勘察应对场地进行水文地质勘察,并应符合下列规定: 1 查明场地地下水类型和补给与排泄条件,各含水层的埋深、厚度和分布以及土层的渗透性等; 2 水文地质条件复杂或岩溶水发育地区应进行单孔或群孔分层抽水试验,测定含水层的渗透系数和影响半径,当存在承压水时应分层测量地下水水位,并确定承压水水头高度; 3 分析施工过程水位降低对支护结构和周围环境的影响,提出应采取相应措施的建议。 4.2.5 特殊岩土层应按下列规定进行有针对性的勘察: 1 花岗岩残积土和风化岩层,应查明各风化层的界面,说明其软化性、崩解性,并分析其对基坑支护的影响; 2 厚度大于2.0m以上的淤泥、淤泥质土,应查明其类型、成因、触变性、固结状态和工程特性,室内土工试验除应进行直接快剪和固结快剪外,尚应进行三轴固结不排水剪和三轴不固结不排水剪试验; 3 岩溶地区,特别是开挖影响范围内可能存在土洞和溶洞时,应查明岩溶的分布、埋藏深度、发育条件、发育程度、洞内充填情况以及充填物的性状等,应分析人工降水引起土洞或地表塌陷的可能性; 4 膨胀土,即使膨胀土仅在基坑的局部薄层存在,都应查明膨胀土的岩性、地质时代、成因、产状、分布以及颜色、节理等外观特征;室内土工试验应测定膨胀土的膨胀率、收缩系数和膨胀力等; 5 厚度大于3.0m的填土层,应了解填筑时间、填料主要成分、填筑方式等,勘察时应进行原位测试并取典型土样进行室内试验; 6 污染土应查明主要污染成分及其可能对施工人员产生的影响。 4.2.6 室内试验或原位测试应符合下列规定: 1 原状岩土试样或原位测试的数量,应满足每一建筑基坑每一主要土层不少于6个(组),连续记录的静力触探或动力触探,每一建筑基坑不应少于3孔; 2 室内试验除常规试验项目外,重点试验项目为重度、直接快剪及固结快剪试验、三轴不固结不排水剪及固结不排水剪试验、渗透试验等。饱和软黏土宜进行高压固结试验判定其应力历史;砂土应做休止角试验,当需进行抗渗透破坏稳定性计算时,宜进行颗粒分析试验,绘制颗粒大小分布曲线;厚度大于3.0m的人工素填土应进行重度和抗剪强度试验; 3 对原位测试的重点试验项目,一般黏性土和砂土应进行标准贯入试验;淤泥、淤泥质土应进行十字板剪切和静力触探试验;碎石土和较厚的填土应进行标准贯入试验或重型动力触探试验。 4.2.7 基坑工程勘察应由建设单位委托查明下列基坑周边环境条件: 1 既有建(构)筑物的用途、结构类型、层数、与基坑的相对位置,基础的形式、埋深; 2 道路的类型、宽度、路基形式和最大的车辆荷载等;桥梁基础形式、桩基长度和持力层位置; 3 各种既有地下管线和地下构筑物的类型、主要尺寸及其埋深,既有的供水、污水、雨水等地下输水管线的使用状况及渗漏状况等; 4 邻近地铁车站或区间的相关竣工资料,包括车站的埋深、尺寸、基础形式,区间的埋深、尺寸、与基坑的位置关系,区间管片的现状等; 5 场地地表水的汇流与排泄条件。 4.3 勘察报告 4.3.1 专项基坑工程勘察应提交专门的基坑工程勘察报告,作为详细勘察报告的一部分时,应列专门章节进行论述。专项的勘察报告应包括以下内容: 1 勘察的目的、要求和任务,基坑工程有关的场地条件、工程地质和水文地质条件及基坑周边环境条件; 2 特殊性岩土的分布及其对基坑影响的分析评价; 3 基坑设计相关的岩土参数和支护结构选型的建议; 4 地下水埋藏条件和水位变化幅度,补给和排泄条件,相关计算参数及地下水控制方法的建议,渗透稳定性的评价; 5 基坑开挖和降水对基坑周边环境的影响评价,对施工阶段的环境保护和监测工作的建议。 4.3.2 岩土工程勘察报告应提供以下主要图表: 1 给出基坑开挖范围线以及基坑周边环境条件等内容的勘探点平面布置图; 2 沿基坑周边的工程地质剖面图,以及必要的垂直于基坑边线的地质剖面图; 3 钻孔柱状图; 4 原位测试和室内试验成果图表,水文地质试验图表等; 5 对岩层基坑给出具有岩性与产状、结构面产状、软弱岩层和破碎带的分布等特征的工程地质图,以及软弱结构面对基坑稳定性起控制作用时的分段有代表性的结构面赤平投影分析图。 5 基坑支护结构水平荷载和抗力计算 5.1 一般规定 5.1.1 基坑支护结构设计应考虑下列荷载: 1 土压力、水压力及浮力; 2 地面堆载及大型车辆的荷载; 3 对基坑侧壁有影响的周边建(构)筑物的荷载; 4 施工荷载及邻近场地施工的影响; 5 支护结构作为主体结构一部分时主体结构荷载产生的偏心受压作用。 5.1.2 土压力及水压力的计算应考虑下列影响因素: 1 土的物理力学性质; 2 地下水位及其变化。 5.1.3 支护结构水平荷载标准值eaik应按可靠的经验确定;当无可靠经验时,宜按本规程第5.2节的规定进行计算。 5.1.4 透水性强的土宜按水土分算方法计算侧压力,透水性弱的土可按水土合算方法计算侧压力。 5.1.5 支护结构水平荷载标准值的计算模式:当进行支护结构内力和变形计算时,应按本规程附录A增量法的荷载模式;当进行支护结构稳定计算时,宜采用朗肯的三角形分布的主动和被动土压力模式。 5.1.6 土压力计算中土的强度指标应按本规程第5.4节的规定采用。 |
联系我们
|
微信联系客服
![]() |
关于我们 | 联系我们 | 收费付款 |
服务热线:400-001-5431 | 电话:010-8572 5110 | 传真:010-8581 9515 | Email: bz@bzfyw.com | |
版权所有: 北京悦尔信息技术有限公司 2008-2020 京ICP备17065875号-1 |
本页关键词: |
DBJ/T 15-20-2016, DBJ 15-20-2016, DBJT 15-20-2016, DBJ/T15-20-2016, DBJ/T 15, DBJ/T15, DBJ15-20-2016, DBJ 15, DBJ15, DBJT15-20-2016, DBJT 15, DBJT15 |