1.0.1 This code is specially prepared to strengthen the management of design works for weak current system engineering of civil terminal building and to improve the system of standards and specifications.
1.0.2 This code is applicable to the planning and design of new, renovated and extended building automatic control system engineering of civil airport terminal building and may be reference for the planning and design of building automatic control system for other civil airport buildings and automatic control system engineering.
1.0.3 The planning and design of building automatic control system engineering of civil terminal building shall earnestly implement relevant national decrees and rules, pay attention to environment protection and energy conservation as well as actively adopt new technology and new equipment to be advanced in technology, reasonable in cost and reliable in safety.
1.0.4 The planning and design for building automatic control system engineering of civil airport terminal building shall take the development trend of building automatic control system into full consideration; the hardware system shall be advanced enough to be compatible with new system in the future; the software system shall be vital to guarantee the upgrading in the future.
1.0.5 The planning and design of building automatic control system engineering of civil airport terminal building shall be in accordance with current national and relevant professional engineering design standards and specifications other than this code.
Foreword I
1 General Provisions
2 Terms and Symbols
2.1 Terms
2.2 Symbols
3 General Requirements
4 System Composition and Network Structure
4.1 System Composition
4.2 Network Structure
5 System Design
5.1 Computer Monitoring and Management System
5.2 Power Transformation and Distribution Control
5.3 Cold/Heat Source Control
5.4 Air-conditioning and Ventilation Control
5.5 Water Supply and Drainage Control
5.6 Lighting Control
5.7 Transmission System
6 Power Supply
7 Line Laying
8 Lightning Protection, Earthing and Equipotential Bonding
9 Environmental Requirements for Central Control Room and Power Equipment Room of BA System
Appendix A Explanation of Wording in This Code