This code specifies requirement for application, work-piece handling and transportation, and work-piece lifting of lifting equipment and lifting rigging.
This code is applicable to lifting construction of petrochemical engineering construction projects.
Foreword
1 Scope
2 Normative references
3 Terminologies and definitions
4 General provision
4.1 General requirement
4.2 Technical preparation
4.3 Safety guarantee for lifting construction
4.4 command for lifting
5 Application of lifting equipment *
5.1 Windlass
5.2 Chain block
5.3 Lifting jack
5.4 Mobile crane
6 Lifting riggings
6.1 Hemp (palm) rope
6.2 Synthetic fibre lifting strip
6.3 Wire rope and sling
6.4 Tackle and polyspast
6.5 Shackle (hooks and snap ring)
6.6 Rope clamp
6.7 Protective becket and protective rope pulley
6.8 Lifting tool
6.9 Lifting eye
6.10 Ground anchor
7 Gin pole
7.1 Operating requirement for gin pole
7.2 Gin pole erection
7.3 Gin pole movement
7.4 Dismantlement of gin pole
8 Handling and transportation of work-piece
8.1 Handling of work-piece
8.2 Transportation of work-piece
9 Work-piece lifting
9.1 General requirement
9.2 Mobile crane lifting
9.3 Gin pole lifting with slipping method