Interface requirement between launch site system and satellite system
1 Scope
This standard specifies the mission interface, general requirements, C3I interface and service support between aerospace launch site (hereinafter referred to as launch site) system and satellite system as well as basic process flow of satellite at launch site.
This standard is applicable to interface control between satellite and launch site, as well as technical preparation, service support and launch of satellite at launch site.
2 Normative references
The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments (excluding corrections) to, or revisions, of any of these publications do not apply. However parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references or references with version not indicated, the latest edition of the normative document referred to applies.
GB 50057 Design code for protection of structures against lightning
GBJ 22 Specifications for the design of factory and mine roads
GJB 98 Anhydrous hydrazine
GJB 151 Electromagnetic emission and sensitivity requirements for military equipment and subsystems
GJB 753 Uns-dimethyl hydrazine
GJB 1673 Specification for nitrogen tetroxide
GJB 1696 Electromagnetic compatibility and grounding requirements of space system facilities
GJB 1963 Specification for methylhydrazine
GJB 2043 Environmental rule for aerospace launch site
GJB 2216 Requirements of package, storage and transportation for hydrazine fuels and nitro-oxidizers
3 Terms and definitions
For the purpose of this standard, the following term and definition apply.
basic process flow
main work flow for testing and launching satellites at launch site, including main work items and their priority, logistics direction and key technical status, implementation site and macro schedule of the main work items, etc.
4 Mission interface
4.1 Missions and requirements of launch site system
The missions and requirements of launch site system generally include:
a) review for the preparation of launch site system before satellite approach;
b) organization, command and coordination of launch missions, and formulation of general test documents such as “launch process flow in flight test ", "network diagram of test mission organization and implementation plan" and “collaborative command procedure for satellite-launch vehicle-ground integrated test";
c) lead role in organizing the quality and safety control of the launch mission, and security guard of the test site;
d) completion of or assistance in unloading, transporting, transferring, lifting and docking of products and equipment, and withdrawing from the site;
e) send of test information such as time, meteorology and progress of work to the satellite system;
f) provision of fixed infrastructure required for technical preparations and launch of the satellite;
g) provision of water, heating, electricity, gas, grounding and other support required for satellite launch test, and monitoring and management of electromagnetic environment of the launch site;
h) provision of technical service support for communication, meteorology, metrology, geodesy and special gas;
i) assistance in ensuring living guarantee of the test team during the mission.
4.2 Missions and requirements of satellite system
The missions and requirements of satellite system generally include:
a) ex-factory review of satellite and test equipment before entering the site;
b) organization, command and implementation of various tests for the system based on the overall test plan;
c) provision of relevant technical data to the launch site system, and submission of the zeroing report and quality report of each stage;
d) provision of relevant information needed for the organization, command and decision-making of the launch test to the launch site system.
4.3 Organization
In order to ensure the unified and smooth command and decision-making of launch missions, the organizations jointly established by the launch site system, satellite system and other test systems are as follows:
a) mission headquarters in launch site area: responsible for organizing and implementing the missions in launch site area, deploying the test plan, and making decisions to deal with major problems in the process of mission implementation;
b) quality control team: responsible for quality and safety control in the test process, coordinating, researching and dealing with major cross-system technical problems;
c) test and launch coordination team: responsible for work arrangement, plan coordination, operation control, technical problem handling and test site management during product test and launch, studying and formulating technical schemes, and coordinating and handling general technical problems;
d) technical safety team: responsible for all technical safety during the test of the test and launch system, inspecting, guiding and supervising the technical safety work of each test and launch system;
e) electromagnetic compatibility team: responsible for monitoring electromagnetic environment, controlling electromagnetic frequency and coordinating electromagnetic compatibility problems;
f) TT&C and communication technology coordination team: responsible for technical management, technical coordination, technical safety and quality control of TT&C and communication system, studying and formulating technical schemes to solve technical problems.
5 General requirements
5.1 Workshop configuration
5.1.1 Satellite final assembly test plant
Transfer room, final assembly test hall, system test room, unit test room, gas distribution room, product storage room, auxiliary room, etc. are configured.
5.1.2 Satellite filling and fairing assembly plant
Transfer room, filling hall, fairing assembly hall, gas distribution room, filling equipment room, auxiliary room, etc. are configured.
5.1.3 Test and launch control building
Test and launch command and control hall, test room, workshop, auxiliary room, etc. are configured.
5.1.4 Initiating explosive device room
Initiating explosive device storage room and test room are configured.
5.1.5 Launch station
Front-end equipment room, power supply room, tower workshop, satellite working platform of umbilical and service towers, air shower, passageway, etc. are configured.
5.2 Power supply and distribution
General requirements for power supply and distribution system in launch site are:
a) the power for satellite test and fire fighting is of the first class load, the power for satellite assembly, test and lighting is of the second class load, and the power for test shall be separated from that for working;
b) uninterruptible power supply (UPS) shall be arranged in important test places to supply power to process loads that are not allowed to be cut off instantaneously; satellite systems may also be provided with UPS power supply if necessary;
c) TN-C-S (three-phase five-wire system) is adopted for the power distribution system, and the type, quality and power of power supply shall meet the requirements of satellite test.
Foreword i
1 Scope
2 Normative references
3 Terms and definitions
4 Mission interface
4.1 Missions and requirements of launch site system
4.2 Missions and requirements of satellite system
4.3 Organization
5 General requirements
5.1 Workshop configuration
5.2 Power supply and distribution
5.3 Lightning protection and grounding
5.4 Electromagnetic compatibility
5.5 Environmental requirements
5.6 Water supply, drainage and fire fighting
5.7 Transportation
6 C3I interface between satellite and launch site
6.1 Interface
6.2 Information from C3I system to satellite network
6.3 Information from satellite network to C3I system
7 Service support
7.1 Communication
7.2 Special gas
7.3 Meteorology
7.4 Metrology
7.5 Geodesy
7.6 Hazard source
7.7 Other supports
7.8 Leaving equipment at site
7.9 Logistics support
8 Basic process flow
8.1 General requirements
8.2 Basic process flow chart of satellite
8.3 Main work contents of basic process flow
Annex A (Informative) Main work in each stage of basic process flow
A.1 Ground equipment unloading and transportation (A1)
A.2 Ground equipment deployment and debugging (A2)
A.3 Satellite unloading, transportation, transferring and in-place checking (M1)
A.4 Unit testing (M2)
A.5 Satellite assembly (M3)
A.6 Satellite leak detection (M4)
A.7 Whole-satellite electrical test (M5)
A.8 Solar wing installation and test (M6)
A.9 Filling preparation (M7)
A.10 Satellite filling (M8)
A.11 Satellite fairing installation (M9)
A.12 Satellite transition and satellite-launch vehicle docking (M10)
A.13 Satellite electrical test (M11)
A.14 Satellite-launch vehicle joint checking (M12)
A.15 Satellite operation before launch vehicle filling (M13)
A.16 Near-launch checking (M14)
A.17 Launch and flight state monitoring (M15)
A.18 State recovery and withdrawal from the site (A3)
航天发射场系统与卫星系统接口要求
1 范围
本标准规定了航天发射场(以下简称发射场)系统与卫星系统间的任务界面、通用要求、C3I接口、勤务保障以及卫星在发射场的基本工艺流程等。
本标准适用于卫星与发射场间的接口控制,以及卫星在发射场的技术准备、勤务保障和发射。
2 引用文件
下列文件中的有关条款通过引用而成为本标准的条款。凡注日期或版次的引用文件,其后的任何修改单(不包含勘误的内容)或修订版本都不适用于本标准,但提倡使用本标准的各方探讨使用其最新版本的可能性。凡不注日期或版次的引用文件,其最新版本适用于本标准。
GB 50057 建筑物防雷设计规范
GBJ 22 厂矿道路设计规范
GJB 98 无水肼
GJB 151 军用设备和分系统电磁发射和敏感度要求
GJB 753 偏二甲肼
GJB 1673 四氧化二氮规范
GJB 1696 航天系统地面设施电磁兼容性和接地要求
GJB 1963 甲基肼规范
GJB 2043 航天发射场发射环境准则
GJB 2216 肼类燃料和硝基氧化剂包装、贮存、运输要求
3 术语与定义
下列术语和定义适用于本标准。
基本工艺流程 basic process flow
卫星在发射场进行测试发射的主要工作流程,包括主要工作项目及先后次序、物流方向及关键技术状态、主要工作项目实施场所及宏观时间安排等内容。
4 任务界面
4.1 发射场系统任务及要求
发射场系统任务和要求一般包括:
a) 卫星进场前对发射场系统准备情况进行评审;
b) 负责发射任务的组织指挥和计划协调,制定“飞行试验测试发射工艺流程”、“试验任务组织实施计划网络图”和“星-箭-地综合测试协同指挥程序”等总体试验文件;
c) 牵头组织发射任务的质量和安全控制工作,负责试验现场的安全警卫;
d) 完成或协助完成产品和设备的卸车、转运、转载、吊装对接以及撤场等工作;
e) 向卫星系统发送时间、气象、工作进程等试验信息;
f) 提供卫星进行各项技术准备和实施发射所需的固定基础设施;
g) 提供卫星测试发射所需的水、暖、电、气、接地等各项保障,进行发射场电磁环境监测和管理;
h) 提供通信、气象、计量、大地测量、特燃特气等各项技术勤务保障;
i) 协助试验队任务期间的生话保障。
4.2 卫星系统任务及要求
卫星系统任务和要求一般包括:
a) 进场前卫星及参试设备通过出厂评审;
b) 按照试验总体计划安排,负责本系统各项试验工作的组织、指挥和实施;
c) 向发射场系统提供相关技术资料,提交归零报告和各阶段质量报告;
d) 向发射场系统提供测试发射组织指挥和决策所需的有关信息。
4.3 组织机构
为保障发射任务指挥决策的统—顺畅,由发射场系统、卫星系统及其他参试系统联合成立的组织机构有:
a) 发射场区任务指挥部:统一负责发射场区任务的组织实施,部署试验计划,决策处理任务实施过程中的重大问题;
b) 质量控制组:负责试验过程中的质量控制和安全把关,协调及研究处理跨系统重大技术问题;
c) 测试发射协调组:负责产品测试发射过程中的工作安排、计划协调、操作把关、技术问题处理和试验现场管理,研究制定技术方案,协调处理一般技术问题;
d) 技术安全组:负责测发系统试验过程中的各项技术安全,检查、指导、督促测试发射各系统的技术安全工作;
e) 电磁兼容组:负责电磁环境的监测、电磁频率的管制和电磁兼容问题的协调;
f) 测控通信技术协调组:负责测控通信系统的技术管理、技术协调、技术安全和质量把关,研究制定技术方案,解决技术问题。
5 通用要求
5.1 工作间配置
5.1.1 卫星总装测试厂房
配置转载间、总装测试厅、系统测试间、单元测试间、配气间、产品存放间、辅助用房等。
5.1.2 卫星加注与整流罩装配厂房
配置转载间、加注厅、整流罩装配厅、配气间、加注设备间、辅助用房等。
5.1.3 测发控制楼
配置测发指挥控制厅、测试间、工作间、辅助用房等。
5.1.4 火工品用房
配置火工品贮存间和火工品测试间。
5.1.5 发射工位
配置卫星前置设备间、电源间、塔上工作间、脐带勤务塔卫星工作平台、风淋室及通道等。
5.2 供配电
对发射场供配电系统的一般要求为:
a) 卫星测试、消防用电为一级负荷,为卫星装配、测试服务的动力、照明用电为二级负荷,测试用电应与动力用电分开;
b) 重要测试场所应设不间断电源装置(UPS),给不允许瞬时断电的工艺负荷供电;卫星系统亦可根据需要自备UPS电源;
c) 配电系统采用TN-C-S(三相五线制),电源种类、品质、功率应满足卫星测试要求。
5.3 防雷与接地
对发射场防雷接地的一般要求为:
a) 除有特殊要求外,发射场防雷应符合GB 50057的规定,接地应符合GJB 1696的规定;
b) 卫星加注与整流罩装配厂房、火工品贮存间和测试间、脐带勤务塔等为第一类防雷建筑,卫星总装测试厂房、测发控制楼等为第二类防雷建筑;
c) 各类接地均接入联合接地系统;
d) 接地线分为信号地、保护地、中性地、防静电接地和等电位接地,卫星系统信号地引线应与其他系统信号地引线分开;
e) 卫星总装测试大厅、脐带勤务塔上卫星封闭区、火工品测试间、储存间等应配备静电消除装置。
5.4 电磁兼容
对发射场电磁兼容的一般要求为:
a) 发射场系统对任务期间发射场区的电磁环境进行统一管理。关键测试节点和实施发射时,发射场区实行电磁监测和电磁管制。
b) 发射场的电磁波辐射设备、通信设备、供电设备、机械设备、照明设备、空调设备、避雷设备等,在正常使用时,其电磁环境应不影响产品的正常测试工作,设备所产生的传递发射和辐射发射应符合GJB 151中有关传导和辐射的规定。
c) 电源线与信号线、高电平信号线与低电平信号线要分开敷设,或采取有效的屏蔽措施。
d) 脐带勤务塔封闭间应具备无线电透波能力,透波率不低于80%。
e) 火工品单元测试宜在屏蔽室内进行。
f) 远距离测试发射控制和信号传递应满足与卫星系统电磁兼容要求。
g) 卫星、火箭、发射场之间应满足电磁兼容性要求,新型号发射任务,须通过一定方式(如发射场合练)检验。
5.5 环境要求
发射场环境要求应符合GJB 2043的规定。
5.6 给排水与消防
对发射场给排水与消防系统的一般要求为:
a) 加注厂房外建设燃烧剂污水收集池和氧化剂污水收集池,加注时冲洗污水分类收集,收集的污水应运往污水处理场进行处理,达到国家规定的排放标准后方可排放;
b) 厂房、脐带勤务塔等设专用水消防系统;
c) 总装测试厅、测试间、测发指挥控制厅等试验场所应设便携式二氧化碳气体灭火器;
d) 加注设备间、加注厅应设脚踏式淋浴器和洗眼喷泉;
e) 卫星加注时消防车在加注厂房外指定位置就位;
f) 普通测试间、脐带勤务塔应设感烟感温探测器;
g) 层高大于12m的大厅宜在侧壁不同高度设置紫外线火焰探测器;
h) 加注用房应设防爆火灾报警器;
i) 厂房、脐带勤务塔应设火灾自动报警系统。
5.7 交通运输
对发射场交通运输的一般要求为:
a) 发射场专用铁路为工业企业二级铁路,轨距1.435m;
b) 发射场各工号间的运输公路不低于GBJ 22中规定的三级公路标准;
c) 卫星由机场或车站向技术区运输的速度不大于30km/h,通过铁路道岔时不大于10km/h;卫星在技术区厂房间及技术区至发射区转运的速度不大于10km/h,通过铁路道岔或转弯时不大于5km/h;
d) 卫星转运途中,道路净高应满足卫星运输高度要求;
e) 对运输有其他要求时,按照相关技术文件的规定执行。
6 卫星与发射场C3I接口
6.1 接口界面
对卫星系统与C3I系统接口界面的一般要求为:
a) 接口方式:通过接口微机或者网络交换机实现互联;
b) 物理接口:RJ45接插件;
c) 传输速率:≥100Mbps;
d) 传输协议:网络数据链路层协议符合IEEE 802.3标准,通信协议TCP/IP,传输层可采用UDP或者TCP协议;
e) 传输方式:采用点对点传输方式或广播方式。
6.2 C3I系统输入给卫星网的信息
C3I系统输入给卫星网的信息一般包括:
a) 指挥信息;
b) 时间信息;
c) 发射场气象信息;
d) 卫星遥测原码。
6.3 卫星网输入给C3I系统的信息
卫星网输入给C3I系统的信息一般包括:
a) 回令及系统工作状态;
b) 卫星主要测试参数;
c) 卫星主要遥测参数。
7 勤务保障
7.1 通信
7.1.1 电话
对电话配置的一般要求为:
a) 各主要工作间和参试人员住所设置场区内部电话;
b) 有关工作间电话应具备国内长途通话能力和传真能力;
c) 国际合作项目工作间应具备国际互联网接口和国际长途通话能力。
7.1.2 调度
对调度配置的一般要求为:
a) 测发控制楼卫星厅设卫星总调度台,各分系统设调度分机或单机;
b) 卫星总装测试厂房系统测试间设总调度台和各系统调度分机,总装大厅设调度单机;
c) 卫星加注厂房加注控制间设调度台,加注厅、加注设备间和配气间设调度单机;
d) 脐带勤务塔卫星工作平台、工作间、地下室前置设备间和电源间设调度单机。
7.1.3 电视监视
对电视监视的一般要求为:
a) 重要场所设置电视监视摄像头,关键时段应进行监视并记录;
b) 卫星、火箭等试验现场的电视图像应传送到测发控制楼卫星厅和有关工作间。
7.1.4 网络接口
主要的测试间、工作间及会议室配置发射场内部网线及接口。
7.2 特燃特气
7.2.1 配气
对供配气的一般要求为:
a) 供气部位:
1) 卫星总装测试厂房:总装测试厅、单元测试间、转载间等;
2) 卫星加注与整流罩装配厂房:转载间、配气间、加注厅等;
3) 脐带勤务塔:卫星所在层的固定平台;
4) 配备气瓶车,对特殊部位进行机动配气。
b) 供气种类:普氮、高纯氮。
c) 供气压强:23MPa。
d) 管路接口:DN10 M22×1.5 喇叭口60°;
DN6 M18×1.5 喇叭口60°。
7.2.2 气体指标
7.2.2.1 普氮
除特殊要求外,对普氮的指标要求一般为:
a) 纯度:体积分数不小于98.0%;
b) 氧含量:体积分数不大于2.0%;
c) 露点:≤-53.3℃;
d) 碳氢化合物:体积分数不大于58.3×10-6;
e) 颗粒物含量:≤1.5mg/m3;
f) 油含量:≤10.0mg/m3。
7.2.2.2 高纯氮
除特殊要求外,对高纯氮的指标要求一般为:
a) 纯度:体积分数不小于99.998%;
b) 氧含量:体积分数不大于10.0×10-6;
c) 氢含量:体积分数不大于3.0×10-6;
d) 露点:≤-65.5℃;
e) 一氧化碳、二氧化碳和碳氢化合物总量:体积分数不大于10.0×10-6;
f) 颗粒物直径:≤20μm;
g) 油含量:≤10.0mg/m3。
7.2.3 气体检验
对试验任务用气源检验的一般要求为:
a) 用气前1周进行全项检验,检验项目包括要求的全部技术指标;
b) 用气前24小时进行抽项检验,检验项目一般包括露点、颗粒物和油含量。
7.2.4 推进剂指标
7.2.4.1 无水肼
除特殊要求外,对无水肼的指标要求一般为:
a) 无水肼:质量分数不小于97.5%;
b) 水份:质量分数不大于1.5%;
c) 铁:质量分数不大于0.002%;
d) 非挥发性残渣:质量分数不大于0.005%。
7.2.4.2 甲基肼
除特殊要求外,对甲基肼的指标要求一般为:
a) 甲基肼:质量分数不小于98.3%;
b) 水份:质量分数不大于1.5%;
c) 颗粒物:≤10.0mg/L。
7.2.4.3 偏二甲肼
除特殊要求外,对偏二甲肼的指标要求一般为:
a) 偏二甲肼:质量分数不小于97.00%;
b) 水份:质量分数不大于0.60%;
c) 偏腙:质量分数不大于2.50%;
d) 颗粒物:≤20.00mg/L;
e) 密度(15℃):0.792g/cm3~0.798g/cm3。
7.2.4.4 四氧化二氮
除特殊要求外,对四氧化二氮的指标要求一般为:
a) 四氧化二氮:质量分数不小于98.5%;
b) 相当水:质量分数不大于0.40%;
c) 颗粒物:≤20.0mg/L。
7.2.4.5 其他推进剂
其他种类推进剂的技术指标按照相应的标准执行。
7.2.5 推进剂检验
对推进剂检验的一般要求为:
a) 无水肼按照GJB 98规定的方法进行检验;甲基肼按照GJB 1963规定的方法进行检验;偏二甲肼按照GJB 753规定的方法进行检验;四氧化二氮按照GJB 1673规定的方法进行检验;其他种类推进剂按照相应的标准进行检验。
b) 加注前2天内进行全项检验,检验项目包括要求的全部技术指标。
c) 加注前的检验必须保留仲裁样。仲裁样应由使用方和检验方有关人员签字后贴封条保存,发射后1个月内无异议并报请有关部门批准后,检验方可将其作为废液处理。
7.2.6 推进剂贮存、运输
对推进剂贮存、运输的一般要求为:
a) 卫星用推进剂根据计划安排由发射场提供或卫星系统自备;
b) 推进剂的包装、贮存、运输应符合GJB 2216的规定。
7.3 气象
对气象保障的一般要求为:
a) 提供发射场长、中、短期天气预报;
b) 及时发布危险天气警报;
c) 卫星转场前,提供卫星预定转运日的天气预报,包括风、云、能见度、最高气温、最低气温及天气现象;
d) 卫星转运前2小时,提供运输时0m~70m浅层风预报;
e) 进行地面气象观测、浅层风测量、高空探测及大气电场监测等,按规定向卫星系统提供相关测量数据。
7.4 计量
对计量保障的一般要求为:
a) 通用仪器仪表的检定、修理和计量测试;
b) 发射任务遂行计量保障。
7.5 大地测量
测量惯性器件测试设备原点大地坐标、重力加速度及真北方向等。
7.6 危险源
卫星如带有放射性等特殊危险源时,应按相关规定设置专用储存场所。
7.7 其他保障
7.7.1 车辆
试验用车辆由发射场和试验队共同提供,具体为:
a) 产品和设备在包装箱状态下的卸车、运输,所用的卡车、拖车、吊车、叉车等通用车辆,由发射场协助提供;
b) 卫星转场用特种车辆,厂房内卫星使用的电瓶车、叉车等,由试验队自备。
7.7.2 工具
试验用工具由试验队和发射场共同提供,具体为:
a) 卫星专用工作平台、工装、吊具等特装设备由试验队自备;
b) 普通工作梯和升降平台等由发射场提供。
7.7.3 通用仪器仪表
试验用通用仪器仪表由试验队自备,发射场提供协助,具体为:
a) 卫星测试用通用仪器仪表主要由试验队自备,需要发射场提供的通用仪器仪表,应在任务进场前与发射场协商确定;
b) 任务期间临时需要的通用仪器仪表,发射场系统可提供协助。