1.0.1 This code is formulated to implement relevant national principles and policies, standardize construction requirements, unify inspection method and define acceptance standard so as to ensure construction and installation quality and to achieve energy saving, material and water conservation, environmental protection and safety operation during the construction and acceptance of cleanrooms and associated controlled environment (referred to as cleanroom from Chapter 3).
1.0.2 This code is applicable to the construction and acceptance of newly-built and reconstructed, entire and assembling as well as fixed and moving cleanrooms and associated controlled environment.
1.0.3 The construction and acceptance of cleanrooms and associated controlled environment shall meet the following requirements:
1 It shall be carried out by professional qualified construction enterprise approved by competent development department according to approved documents and drawings. The constructors shall receive training and assessment on construction and acceptance specification of cleanroom; the special category of workers shall have work license and shall be supervised all over the process by supervision organization with professional supervision aptitude and specialized training.
2 Construction organization design shall be formulated before construction. During construction, different categories of workers shall be keep close coordination and carry out construction according to the specified procedure. No construction shall be carried out for engineering projects without drawings, technical requirements and construction organization design. The change file from design unit shall be provided during engineering construction to modify the design. No performance acceptance shall be carried out on engineering projects without completion drawing.
3 The specification, model, performance and technical index of all materials, equipments, finished products and semi-finished products used in projects shall meet the requirements of design and current relevant national standards, and there shall be complete legal quality evidentiary documents. Inspection must be carried out if there is any doubt on their quality. The overdue materials shall not be used any more.
4 After finishing complex procedure construction of section subitem project and engineering, it shall carry out section acceptance. If the section acceptance is unqualified, it must be reworked until qualified and shall be recorded and filed.
1.0.4 This code shall be used together with the current national standard "Unified Standard for Constructional Quality Acceptance of Building Engineering" (GB 50300).
The construction and acceptance of cleanrooms and associated controlled environment shall not only comply with the requirements stipulated in this code, but also shall meet those in the relevant current ones of the nation.
Contents 1 General 2 Terms 3 Building Structure 3.1 General Provisions 3.2 Structure Construction Requirements 3.3 Section Acceptance 4 Building Decoration 4.1 Building Decoration 4.2 Ground 4.3 Wall Surface 4.4 Suspended Ceiling 4.5 Wall Corner 4.6 Door and Window 4.7 Seal Gap 4.8 Section Acceptance 5 Air System 5.1 General Provisions 5.2 Duct and Fitting Manufacture 5.3 Duct Installation 5.4 Parts and Accessories Installation 5.5 Air Outlet Installation 5.6 Supply Air Terminal Installation 5.7 Section Acceptance 6 Gas System 6.1 General Provisions 6.2 Pipe and Accessory 6.3 Pipeline System Installation 6.4 Strength Test of Pipeline System 6.5 The Ablution of Pipeline System 6.6 Gas Supply Unit 6.7 Section Acceptance 7 Water System 7.1 General Provisions 7.2 Water Supply 7.3 Drainage 7.4 Hot Water 7.5 Purified Water and High Purity Water 7.6 Section Acceptance 8 Chemical Materials Supply System 8.1 General Provisions 8.2 Storage Facility 8.3 Pipeline and Components 8.4 Section Acceptance 9 Power Distribution System 9.1 General Provisions 9.2 Wiring 9.3 Electrical Equipment and Device 9.4 Section Acceptance 10 Automatic Control System 10.1 General Provisions 10.2 Automatic Control Equipment Installation 10.3 Pipeline Construction of Automatic Control Equipment 10.4 Integrated Debugging of Automatic Control Equipment 10.5 Section Acceptance 11 Device Installation 11.1 General Provisions 11.2 Purification Device Installation 11.3 Air-conditioning Equipment and Cold and Heat Source Device Installation in the Equipment Level 11.4 Biosafety Cabinet Installation 11.5 Process Equipment and Facility 11.6 Section Acceptance 12 Fire Control System 12.1 General Provisions 12.2 Smoke Control System 12.3 Fire Curtain, Fire Door and Fire Window 12.4 Emergency Lighting and Dispersal Indicator 12.5 Section Acceptance 13 Shielding Facility 13.1 General Provisions 13.2 Shield 13.3 Shielding Room 13.4 Pipeline, Door Type Tunnel and Other Requirements 13.5 Section Acceptance 14 Antistatic Facilities 14.1 General Provisions 14.2 Antistatic Floor 14.3 Antistatic Terrazzo Floor 14.4 Antistatic PVC Floor 14.5 Antistatic Porcelain Tile Floor 14.6 Surface Course and Coating 14.7 System Components 14.8 Section Acceptance 15 Construction Organization and Management 15.1 General Provisions 15.2 Staff and File 15.3 Construction Measures 15.4 Safety Measures 15.5 Environmental Protection and Energy Conservation 16 Project Test 16.1 General Provisions 16.2 Test Items 16.3 Test Period 16.4 Performance Test 17 Acceptance 17.1 General Provisions 17.2 Section Acceptance Period 17.3 Completion Acceptance Period 17.4 Performance Acceptance Period 17.5 Project Acceptance 17.6 Operation Acceptance Appendix A Air Duct Leak Test Method A.1 Test Equipment A.2 Test Method A.3 Air Leakage Rate Calculation of Pipe Section Appendix B Construction Inspection Tables Appendix C Construction Acceptance Tables Appendix D In Situ Leak Scan Test of HEPA Fitters D.1 Principle D.2 Photometer Method D.3 Particle Counter Method D.4 The Generation of Leak Test Aerosol Appendix E The Comprehensive Performance Test Method of Clean Room E.1 Air Volume and Air Velocity Test E.2 Static Pressure Difference Test E.3 The Unevenness Test of Cross-sectional Air Velocity in Unidirectional Clean Room E.4 Particle Count Test E.5 Temperature and Humidity Test E.6 Sound Level Test E.7 Illumination Test E.8 Airborne Microorganism Test E.9 Surface Conductivity Test E.10 Vibration Test E.11 Recovery Time Test E.12 Airflow Test E.13 Formaldehyde Concentration Test E.14 Ammonia Concentration Test E.15 Ozone Concentration Test E.16 Carbondioxide Concentration Test Appendix F Biological Evaluation Method F.1 Microbe Transmittance of Return and Exhaust High Efficiency Particulate Air Filter Air Outlet F.2 The Inhibition Ability Evaluation of the Local Leak Diffusion of Microbiological Aerosol F.3 Isolation Coefficient of Biosafety Cabinet Appendix G Test Method for Cleanroom Airtight G.1 Principle G.2 Pressure-decay Method G.3 Constant Pressure Method G.4 Safety Requirements Appendix H Airborne Molecular Contamination Test H.1 Airborne Molecular Contamination (AMC) H.2 Test Method H.3 Impact Sampling Method H.4 Adsorbent Tube Sampling Method Explanation of Wording in This Code List of Quoted Standards