1.0.1 This code is formulated with a view to specify the engineering cost valuation behavior, unify the compilation and valuation method of bill of quantity of construction works, according to laws and regulations of "Building Law of the People's Republic of China", "Contract Law of the People's Republic of China" and "Law of the People's Republic of China on Bid Invitation and Bidding".
1.0.2 This Code is applicable to valuation activities with bill quantity of construction work.
1.0.3 All user-state includes the capital investment or state-owned capital investment based (hereinafter referred to as "state-owned capital investment" for both) construction project, which must adopt valuation with bill of quantity.
1.0.4 Non-state-owned capital invested construction projects can adopt the valuation with bill of quantity.
1.0.5 Bill of quantity (BOQ), bidding control prices, bids, engineering payment settlement and other engineering cost document preparation or check shall be assumed by qualified engineering cost professionals.
1.0.6 The valuation activities with bill of quantity of the construction works shall follow the objective, just and fair principles.
1.0.7 Annex A, Annex B, Annex C, Annex D, Annex E and Annex F of this Code shall be used as the basis for the preparation of BOQ.
1 Annex A, the BOQ items and computational rules of the construction works, is applicable to industrial and civil buildings and structures engineering.
2 Annex B, the BOQ items and computational rules of the decorating projects, is applicable to industrial and civil building and structures decorating projects.
3 Annex C, the BOQ items and computational rules of the installation works, is applicable to industrial and civil building installation works.
4 Annex D, the BOQ items and computational rules of municipal works, is applicable to urban municipal construction works.
5 Annex E, the BOQ items and computational rules of landscaping works, is applicable to landscaping works.
6 Annex F, the BOQ item and computational rules of mine engineering, is applicable to mine engineering.
1.0.8 The valuation activities with BOQ of construction works shall not only comply with this Code, but also those in the current relevant ones of the nation shall be complied with.
Contents
1. General Provisions
2. Terms
3. BOQ Preparation
3.1 General Provisions
3.2 BOQ of Partial Works
3.3 Measures Project List
3.4 Other Project List
3.5 Stipulated Fees Project List
3.6 Tax Project List
4. BOQ Valuation
4.1 General Rules
4.2 Bidding Control Price
4.3 Competitive Price
4.4 Agreement of Engineering Contracting Payment
4.5 Engineering Measurement and Payment
4.6 Claim and On-site Authentication
4.7 Engineering Payment Adjustment
4.8 Completion settlement
4.9 Treatment of Engineering Valuation Disputes
5. BOQ Valuation Form
5.1 Composition of Valuation Form
5.2 Terms for the Use of Valuation Table
Annex A Items and Calculation Rules of BOQ of Construction Works
I Entity items
A.1 Earth (stone) work
A.2 The foundation engineering of pile and foundation
A.3 Brick Work
A.4 The concrete and reinforced concrete works
A.5 The gate, special door and wood structure engineering of the plant storeroom
A.6 Metallic structure works
A.7 Roof and waterproofing work
A.8 Antisepsis, heat insulation and incubation work
II Measure project
Annex B Bill of Quantity and Computation Rules of Ornament and Decoration Works
I Entity items
B1 Floor Surface Works
B2 Wall and Column Project
B3 Ceiling Project
B4 Windows and Doors Project
B5 Paint, Coating and Paste Project
B.6 Other Projects
II. Measures Project names
Annex C Installation BOQ Items and Computational Rules
I. Physical Projects
C.1 Mechanical Equipment Installation
C.2 Electrical Equipment Installation Project
C.3 Heating Equipment Installation Project
C.4 Kiln Masonry Works
C.5 Fabrication and Installation Works of Standing Equipment and Technological Metal Structure
C.6 Industry Pipework
C.7 Fire Protection Engineering
C.8 Project of Water Supply and Drainage, Heating and Fuel Gas
C.9 Air Conditioning and Ventilation Engineering
C.10 installation works of Automation Control Instruments
C.11 Installation of Communication Equipment and line
C.12 Installation of built intellectualized system facility
C.13 Long-distance Pipeline Transportation Project
II. Measure Project
Annex D BOQ project and computation rules for municipal works
I. Entity project
D.1 Earth and rock project
D.2 Road project
D.3 Bank protection works of bridges and culverts
D.4 Tunnel project
D.5 Municipal pipe network project
D.6 Subway project
D.7 Reinforcing works
D.8 Dismantlement project
II Measure items
Annex E BOQ project and computation rules for landscaping project
E.1 Landscape project
E.2 Park Road, Part Bridge and Rockery Works
E.3 Gardens Landscape Engineering
Annex F Bill Quantity and Computational Rules of Mine Engineering
I. Physical Projects
F.1 Outdoor Projects
F.2 Mine Shaft Engineering
II. Measure Items
Explanation of Wording in this Code