1.0.1 This code is formulated with a view to strengthening the project supervision of all kinds of electronic information system room, unifying the construction and assuring the engineering quality.
1.0.2 This code is applicable to the construction and acceptance inspections of newly-built, reconstructed and extended electronic information system room projects that are under construction.
1.0.3 The construction and acceptance inspection of the electronic information system room not only shall perform the requirements stipulated in this code, but also shall comply with those specified in the current relevant standards and codes of the nation.
1 General provisions 1 2 Terms 2 3 Fundamental provisions 3 3.1 Basic requirements of construction 3 3.2 Basic requirements of materials and equipments 3 3.3 Basic requirements on acceptance inspection of partitioned and subdivisional work constructions 4 4 Power supply and distribution system 5 4.1 General provisions 5 4.2 Electrical devices 5 4.3 Wiring and laying 6 4.4 Illumination devices 7 4.5 Construction acceptance 7 5 Lightning protection and grounding system 9 5.1 General provisions 9 5.2 Lightning protection and grounding device 9 5.3 Grounding conductor 9 5.4 Construction acceptance 10 6 Air-conditioning system 11 6.1 General provisions 11 6.2 Installation of air-conditioning equipments 11 6.3 Installation of other air conditioning equipments 11 6.4 Manufacturing and installation of air pipe and components 12 6.5 Debugging of air-conditioning system 13 6.6 Construction acceptance 13 7 Water supply and drainage system 14 7.1 General provisions 14 7.2 Pipe installation 14 7.3 Construction acceptance 15 8 Integrated wiring 16 8.1 General provisions 16 8.2 Wire cable laying 16 8.3 Construction acceptance 18 9 Monitoring and safety protection 20 9.1 General provisions 20 9.2 Installation of equipments and facilities 20 9.3 Wiring and laying 21 9.4 System debugging 21 9.5 Construction acceptance 23 10 Fire-fighting system 24 11 Indoor fitment and decoration 25 11.1 General provisions 25 11.2 Suspended ceiling 25 11.3 Partition wall 26 11.4 Ground processing 27 11.5 Free access floor 27 11.6 Treatment on inner wall, ceiling and column surface 28 11.7 Door and window and others 29 11.8 Construction acceptance 29 12 Electromagnetic shielding 31 12.1 General provisions 31 12.2 Installation of cases 31 12.3 Installation of shielding door 32 12.4 Installation of filter, cut-off waveguide ventilating window and shielding glass 32 12.5 Self-checking of shield effectiveness 33 12.6 Other construction requirements 33 12.7 Construction acceptance 34 13 Integration testing 35 13.1 General provisions 35 13.2 Temperature and humidity 35 13.3 Air-laden dust concentration 36 13.4 Illumination intensity 36 13.5 Noises 36 13.6 Electromagnetic shielding 36 13.7 Ground resistance 36 13.8 Voltage, frequency and waveform deviation factor of electric power supply 37 13.9 Air volume 37 13.10 Positive pressure 37 14 Acceptance and handover of completion of projects 38 14.1 General provisions 38 14.2 Procedure and content of final acceptance 38 Annex A Data Sheet of the Acceptance Inspection on Power Supply and Distribution System 40 Annex B Data Sheet of Acceptance Inspection on Lightning Protection and Grounding Devices 41 Annex C Data Sheet of Testing on Air-conditioning System 42 Annex D Data Sheet of the Performance Testing on the Engineering Electricity of Cable and Optical Cable Generic Cabling System 44 Annex E Data Sheet of Function Test of Monitoring and Safety Protection System 45 Annex F Data Sheet for Testing of the Shield Effectiveness of Electromagnetic Shielding Enclosure 46 Annex G Engineering Acceptance Table of Electromagnetic Shielding Enclosure 47 Annex H Data Sheet of Integration Testing of Electronic Information System Room 48 Annex J Table of Final Completion Acceptance of Engineering Quality 49 Explanation of Wording in this code 50