1.0.1 This standard is formulated with a view to follow out the power construction guidelines of "Secure, Applicable, Economic and Aesthetic”, unify standards for designing of architectural finishings of thermal power plants, ensure the finish quality, transfigure the interior/exterior environment of building and create civilized production conditions.
1.0.2 This standard is applicable to all kinds of fuel electric plant projects of construction, extension and renovation which is provided with a turbo generator unit in a capacity of 50~600MW. The foreign-related projects and others may be implemented in the way of cross reference according to the practical situation.
1.0.3 The standard for designing of architectural finishings of thermal power plants were divided into 3 grades related to Grade I, II and III according to the quality of finish materials, construction craftwork and required investment cost. The proportions of finish charges accounting the direct charges of construction investment may be divided into Class A and B, Class A indicates the ones with a single-machine capacity in 200MW and above, and Class B indicates the ones with a single-machine capacity in 200MW and under.
1.0.4 The finish design of each monomial construction shall adopt materials of different grades according to the finish parts and requirements of investment ratio of belonged grade.
1.0.5 Not only the requirements stipulated in this standard, but also those in the current relevant ones of the nation, Technical Code for Designing Thermal Power Plants and Technical Regulation for Designing Construction of Thermal Power Plants shall be complied with in the design of architectural finishings of thermal power plants.
1 General provisions
2 Basic requirements
3 Architectural finishing of main power house
3.1 Main power house
3.2 Central control building
4 Electric architectural finishing
4.1 Main control building (network control building)
4.2 Communication building
4.3 Electric laboratory building
4.4 Distribution device building
5 Fuel architectural finishing
5.1 Coal discharging construction
5.2 Coal-store construction
5.3 Coal transport construction
5.4 The coal-transport complex building
5.5 Locomotive shed and coal bulldozer shed
5.6 Fuel pump room
5.7 Deash construction
6 Chemical architectural finishing
6.1 Boiler feed water treated plant
6.2 Circulating water treated plant
6.3 Circulating water chlorinator room
6.4 Acid/alkali discharging pump room
6.5 Oil treatment room
6.6 Hydrogen production station
6.7 Other chemical constructions
7 Subsidiary building finish
7.1 Repair plant
7.2 Air compressor room
7.3 Ethine station
7.4 Metal laboratory
7.5 Partial field repair bay
8 Subsidiary architectural finishing
8.1 Guarder lodge
8.2 Material storage
8.3 Garage
8.4 Firehouse
9 Office construction and plant side living architectural finishing
9.1 The administration and production office building
9.2 Mess hall
9.3 Bathroom
9.4 Duty dormitory and bachelor's dormitory
9.5 Reception centre
9.6 Nursery and kindergarten
9.7 Club
Appendix A: The investment proportion schedule of architectural finishing in thermal power plants
Appendix B: Explanation of Wording in this standard
Additional explanation: