1 General Provisions
1.0.1 This code is formulated with a view to strengthening the construction technology management of roads in city and town, standardizing construction requirements, unifying inspection and acceptance standard of construction and quality as well as improving engineering quality.
1.0.2 This code is applicable to the inspection and acceptance of the construction and quality of constructed, renovated or extended roads, squares, parks in city and town.
1.0.3 The quality standard of materials, semi-finished products and or finished products shall be in accordance with the relevant national current standards.
1.0.4 The construction and quality acceptance of road works in city and town shall not only meet the requirements stipulated in this code, but also comply with those in the current relevant ones of the nation.
2 Terms and Codes
2.1 Terms
2.1.1 Cement concrete surface course
A road surface course paved by cement concrete.
2.1.2 Bituminous surface course
A generic term for road surface course paved with bitumen as a binder.
2.1.3 Bituminous mixed surface course
A generic term for surface course paved by extremely-coarse-particle, coarse-particle, medium-particle, fine-particle and sand-particle bituminous mixture mixed by bituminous binder and different mineral aggregates.
2.1.4 Dominant item
Test items which plays a decisive role in the quality, safety, hygiene, environment protection and public interests of road works in city and town.
2.1.5 General item
Test items except dominant items.
2.1.6 Sampling inspection
Inspection, based on a sampling plan, on a certain quantity of samples taken from materials, members and accessories as well as equipment or road works in city and town.
2.2 Codes
A - Petroleum bitumen for road;
AC - Dense-grading bituminous concrete mixture, including coarse mixture and fine mixture;
AL(M) - Medium-curing liquefied petrolatum bitumen;
AL(R) - Rapid-setting liquefied petrolatum bitumen;
AL(S) - Slow-setting liquefied petrolatum bitumen;
AM - Half-open grading bituminous stabilized crushed stone mixture;
ATB - Dense-grading bituminous stabilized crushed stone mixture;
ATPB - Drain-type bituminous stabilized crushed stone mixture paved on the bottom of bitumen layer;
BA - Mixture-type anionic emulsified bitumen;
BC - Mixture-type cationic emulsified bitumen;
EVA - Ethylene-Vinyl-Acetate Copolymer;
OGFC - Coarse-pored open-grading drain type bituminous wearing coat;
PA - Spray type anionic emulsified bitumen;
PC - Spray type cationic emulsified bitumen;
PE - Polyethylene;
SBR - Styrene-Butadiene-Rubber (styrene butadiene rubber);
SBS - Styrene-Butadiene-Styrene B1ock Copo1ymer
SMA - Stone Mastic Asphalt (Britain) or Stone Matrix Asphalt (America).
3 Basic Requirements
3.0.1 The construction organization shall have corresponding construction qualification for road works in city and town.
3.0.2 The construction organization shall establish sound construction technology, quality and safe production management system as well as formulate and implement construction management systems.
3.0.3 Before construction, the construction organization shall organize relevant construction technology management personnel to carry out deep site investigation, learn about the site condition and make sufficient construction preparation.
3.0.4 Before commencement, the construction organization shall investigate the construction site according to the contract documents, design documents, relevant laws and regulations, standards, codes and specifications as well as information on such structures as underground pipelines within the construction boundary and engineering hydrogeological information; moreover, the construction organization shall prepare construction organization design according to the engineering characteristics and make examination and approval according to its management procedure.
3.0.5 The construction organization shall be carry out according to the approved valid design documents as specified in contract. The construction organization mustn't carry out according to unapproved design change and engineering negotiation.
3.0.6 During construction, the construction measurement shall be rechecked to guarantee accuracy.
3.0.7 During construction, a safe technical disclosure system must be established. In addition, relevant safety technology education and training shall be provided for operation personnel. Before operation, the personnel in charge of construction technology must make detailed safe technical disclosure to the operation personnel.
3.0.8 In winter and rainy season, a special construction plan shall be formulated based on actual engineering conditions and implemented upon approval according to the examination and approval procedure.
3.0.9 During construction, the next subitem engineering mustn't be proceeded before the previous subitem engineering passes the acceptance.
3.0.10 The new pipelines and other structures laid below roads in city and town, subject to synchronous construction with roads, shall coordinate road construction according to the principle of from depth to shallowness. During construction, the existing and constructed overground poles and lines as well as underground pipelines shall be well protected.
3.0.11 The manhole seats within the road scope (including pedestrian path and isolation belt) shall be arranged above the concrete or reinforced concrete rings. The covers should be lockable. The covers and seats of manholes shall match the road traffic grade.
3.0.12 During construction, the construction process and finished product quality shall be controlled according to the requirements of contract documents as well as the current relevant national standards.
3.0.13 The road works shall include unit engineering, subsection engineering, subitem engineering and inspection lot which constitute the inspection and acceptance foundation of engineering construction and quality.
1 General Provisions
2 Terms and Codes
2.1 Terms
2.2 Codes
3 Basic Requirements
4 Construction Preparation
5 Measurement
5.1 General Requirements
5.2 Plane Control Measurement
5.3 Elevation Control Measurement
5.4 Construction Positioning Measurement
6 Subgrade
6.1 General Requirements
6.2 Drainage and Dewatering in Construction
6.3 Earthwork Subgrade
6.4 Stonework Subgrade
6.5 Road Shoulder
6.6 Construction Processing
6.7 Special Soil Subgrade
6.8 Inspection Standard
7 Base
7.1 General Requirements
7.2 Lime Stabilized Soil Base
7.3 Base of Lime and Pulverized Fuel Ash Stabilized Gravels
7.4 Stabilized Soil Base of Lime, Pulverized Fuel Ash, and Steel Slag
7.5 Cement Stabilized Soil Base
7.6 Graded Sand Gravel and Graded Gravel Base
7.7 Graded Crashed Stone and Graded Crashed Gravel Base
7.8 Inspection Standard
8 Mixed Charge Level of Bitumen
8.1 General Requirements
8.2 Hot Mixed Bituminous Mixed Surface Course
8.3 Cold Mixed Bituminous Mixed Surface Course
8.4 Prime Coat, Tack Coat and Seal Coat
8.5 Inspection Standard
9 Bituminous Penetration Type and Bituminous Surface Treatment Surface Course
9.1 General Requirements
9.2 Bituminous Penetration Surface Course
9.3 Bituminous Surface Treatment Surface Course
9.4 Inspection Standard
10 Cement Concrete Surface Course
10.1 Raw Materials
10.2 Concrete Mix Proportion Design
10.3 Construction Standard
10.4 Shuttering and Reinforcement
10.5 Stirring and Transportation of Concrete
10.6 Concrete Paving
10.7 Surface Coarse Curing and Joint Filling
10.8 Inspection Standard
11 Paved Surface Course
11.1 Rock Surface Course
11.2 Precast Concrete Block Surface Course
11.3 Inspection Standard
12 Surface Course of Squares and Parks
12.1 Construction Technology
12.2 Inspection Standard
13 Sidewalk Paving
13.1 General Requirements
13.2 Paved Surface Course for Sidewalk by Dressed Stone and Precast Block
13.3 Sidewalk Surface Course Paved by Bituminous Mixture
13.4 Inspection Standard
14 Pedestrian Underpass Structure
14.1 General Requirements
14.2 Cast-in-place Reinforced Concrete Pedestrian Underpass
14.3 Precasting and Installation of Reinforced Concrete Structure Pedestrain Underpass
14.4 Masonry Wall and Reinforced Concrete Top Plate Structure Pedestrian Underpass
14.5 Inspection Standard
15 Retaining Wall
15.1 General Requirements
15.2 Cast-in-place Reinforced Concrete Retaining Wall
15.3 Assembled Reinforced Concrete Retaining Wall
15.4 Masonry Retaining Wall
15.5 Reinforced Earth Retaining Wall
15.6 Inspection Standard
16 Auxiliary Structure
16.1 Curb
16.2 Rain Drainage Branch Pipe and Gully
16.3 Drainage Ditch or Intercepting Ditch
16.4 Inverted Siphon and Culvert
16.5 Slope Protection
16.6 Isolation Pier
16.7 Fence
16.8 Barrier
16.9 Noise Barrier
16.10 Anti-glare Board
16.11 Inspection Standard
17 Construction during Winter and Rainy Season
17.1 General Requirements
17.2 Construction during Rainy Season
17.3 Winter Construction
18 Engineering Quality and Completion Acceptance
Appendix A Record Tables for Subitem, Subsection and Unit Engineering Inspection
Explanation of Wording in this Code