1 Application scope
The Rules are applicable to interior material products made of organic materials or organic composite materials used in road motor vehicles (hereinafter referred to as "interior materials").
Any adjustment to the application scope caused by any change(s) in laws and regulations or related product standards, technologies, industrial polices and other factors shall be subject to the announcement issued by the Certification Alliance for Vehicle (CAV).
2 Certification mode
The certification mode for interior material products is type test + initial factory inspection + post-certification supervision.
The basic certification steps include:
a. Application for certification
b. Product type test
c. Initial factory inspection
d. Evaluation and approval of certification results
e. Post-certification supervision
The initial factory inspection shall be carried out according to the mode of conformity of production (CoP) control plan review + factory on-site inspection for COP. According to the different organization and production modes and characteristics of products, differentiated CoP inspection and post-certification supervision may be adopted in specific implementation.
3 Application for certification
3.1 Division of certification unit
In principle, interior materials produced by the same producer (manufacturer) and the same production enterprise (workplace) without significant differences in the following aspects are regarded as one certification unit:
Single material:
(1) Material;
(2) Processing technology.
Composite material:
(1) Material and thickness of each layer;
(2) Processing technology;
(3) Mode of connection between layers.
Multi-piece spliced materials:
(1) Material and structure of each piece (single or composite);
(2) Processing technology;
(3) Mode of connection between pieces.
For the interior materials for buses, the classification due to different application materials, interior materials (parts) contained and use positions shall also be considered.
The applicant shall file the application for certification according to the unit division principle. A unit may include products of multiple models. When products of multiple models and specifications are taken as a certification unit, the applicant shall submit a description of the differences between the products of different models and specifications. The same model refers to the products that have no impact on the standard compliance in design.
The same products produced by the same producer and different production enterprises (they shall be manufactured with the same production process and with the same key part/raw material suppliers), or the same products produced by different producers and the same production enterprise, shall be divided into different application units, but the type test may only be carried out on the samples of only one unit. For the products of other production enterprises/producers, the data for conformity checking shall be provided for such purpose.
3.2 Submittals for certification application
The applicant shall file the application for certification to the CAV certification agency through the network (www.CAV.com.cn), and shall fill in the necessary enterprise information and product information as required. The CAV will, according to relevant requirements, review the application and issue a notice of accepting or rejecting the application, or request the applicant to re-file an application for certification after rectification.
The applicant shall provide relevant application data and technical data to the CAV and/or the entrusted laboratory according to the requirements of the certification scheme after the application is accepted, generally including:
(1) Application form for certification;
(2) Certification materials:
a. Registration certificates of the applicant, producer and production enterprise, such as business license (at initial application or in case of any change);
b. If the three parties are not the same enterprise, the relevant agreements or contracts signed by the relevant parties (such as entrusted processing agreement, and authorization letter) shall also be submitted (if applicable);
c. If the applicant is a seller or an importer, it must also submit a copy of the relevant contract concluded between the seller and the producer or between the importer and the producer (at initial application or in case of any change);
d. The power of attorney of the agent (if applicable);
e. Certificates of domestic entity that can bear legal responsibilities in case of an overseas production enterprise (when required by relevant laws and regulations).
(3) Technical data such as product description, photos and product drawings;
Foreword I
1 Application scope
2 Certification mode
3 Application for certification
3.1 Division of certification unit
3.2 Submittals for certification application
4 Type test
4.1 Type test scheme
4.2 Requirements for type test samples
4.3 Reference standards and test items
4.4 Implementation of type test
4.5 Disposal of samples
4.6 Type test report
4.7 Utilization of enterprise testing resources
5 Initial factory inspection
5.1 Basic requirements
5.2 Review of CoP control plan
5.3 Factory on-site inspection
6 Evaluation and approval of certification results
6.1 Certification evaluation and decision
6.2 Evaluation and decision on maintenance parts of discontinued-production models
6.3 Certification time limit
7 Post-certification supervision
7.1 Post-certification supervision time
7.2 Supervisory inspection for CoP
7.3 Supervisory sampling testing or inspection
7.4 Evaluation of post-certification follow-up inspection results
8 Certificate
8.1 Maintenance of certificate
8.2 Change of certificate
8.3 Cancellation, suspension and revocation of certificate
8.4 Electric certificate
8.5 Certificate issuance for the same manufacturer
8.6 Certification extension
9 Use of product certification mark
9.1 Mark permitted to use
9.2 Mark application method
9.3 Mark application position
10 Charging
11 Certification responsibilities
12 Technical dispute and appeal
13 Others
Annex 1 Description of interior material products
Annex 2 CoP requirements
Appendix 1 Requirements for factory quality assurance capacity
Appendix 2 Requirements of CoP control plan
Appendix 3 Requirements for implementation report of CoP control plan
Annex 3 Certification implementation of after-sale maintenance spare parts for discontinued-production models
Annex 4 Measures for classification management of production enterprises
Annex 5 Requirements for the quantity and dimensions of test samples to be submitted/sampled