1.1 This Atlas is prepared according to the "Notice on Preparing Work Plan of National Building Standard Design Atlas" (JIANZHIHAN [2002] No. 290) of the Ministry of Construction.
General Introductions
Selection Example for Underground Node
Underground Wall Construction (I)
Underground Wall Construction (II)
Selection Example for Wall Mesh and Core Column Node
Core Column Construction for External Corner Wall (I)
Core Column Construction for External Corner Wall (II)
Construction of External Corner Wall Made of Insulation Block
Construction of Internal Corner Wall Made of Insulation Block
Construction of Core Column for T-shaped Wall (I)
Construction of Core Column for T-shaped Wall (II)
Construction of Core Column for T-shaped Wall (III)
Construction of Insulation Block of T-shaped Wall
Construction of Core Column of Cross Wall
Arrangement of Core Column at Wall Pier
Buttress Construction (I)
Buttress Construction (II)
Anchoring and Lapping of Core Column Steel Bar
Wall Connection (I)
Wall Connection (II)
Connection of Full-length Tie Bar Mesh (I)
Connection of Full-length Tie Bar Mesh (II)
Cast-in-situ Strip under Windowsill of Bottom and Top Storeys (I)
Cast-in-situ Strip under Windowsill of Bottom and Top Storeys (II)
Example for Arrangement of Constructional Column of Wall
Connection between Constructional Column and Foundation
Connection of Constructional Column and Wall Body
Constructional Column Construction (I)
Constructional Column Construction (II)
Constructional Column Construction (III)
Example for Selection of Ring Beam Construction
Ring Beam Construction (I)
Ring Beam Construction (II)
Ring Beam Construction (III)
Construction for Connection of Ring Beam and Precast Slab (I)
Construction for Connection of Ring Beam and Precast Slab (II)
Tie Connection of Precast Floor and Roof Slab
Parapet Wall Construction (I)
Parapet Wall Construction (II)
Cantilever Beam Construction of Cast-in-situ Balcony
Block Lintel Construction
Measures for Preventing Wall from Cracking